Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in An Nasirah

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in An Nasirah

Bathroom waterproofing before tiling in An Nasirah starts with photos of the bathroom and its size, sent by call or WhatsApp. A continuous waterproof membrane goes on the floor and wet-area walls before adhesive and tiles, with the extent set from the photos.

An Nasirah includes older houses, refurbished homes and residential flats, and its bathrooms range from long-standing to recently rebuilt. In older houses the concrete base may be worn with open joints, making a membrane necessary once old tiles are removed. Near the sea interior walls stay damp for longer. The photos show the condition of your floor and walls.

  • An Nasirah is a district in the Dammam area of the Eastern Province, near the sea, Al Jawahir and Al Husain.
  • An older concrete base wears and opens its joints over time, so it should be checked before the membrane goes on.
What the service includes

The scope of the work in An Nasirah

  • Forming and treating the floor-to-wall corners before the main layer
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Applying the membrane over the full floor and up the walls in the wet zone
How we work

This is how we work in An Nasirah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

We serve An Nasirah and around itIncluding Al Bahr (near Qatif), Al Jawahir and Al Husain, as part of our work across the Eastern Province.

Bathroom waterproofing before tiling in An NasirahWe choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in An Nasirah

Is new tiling alone enough for an old bathroom in An Nasirah?

Usually not, since tiles do not stop water if the base is porous or cracked. Send photos of the exposed floor and we will say whether it needs a membrane before tiling.

Can a flat bathroom in An Nasirah be waterproofed without demolishing the walls?

In most cases yes, as the membrane goes on the floor and exposed walls after only partial tile removal. The photos will show whether that is enough for your case.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

How do I request bathroom waterproofing before tiling in An Nasirah?

Call us, or send clear photos of the spot and its location in An Nasirah on WhatsApp, and we will work out the next step with you.

Nearby areas

We also offer it in neighbouring areas

Nearby areas we also cover: Al Bahr (near Qatif), Al Jawahir and Al Husain.

Other services in the area

More services in An Nasirah

Worker applying the white insulation layer on a villa roof by the sea

Tell us about your site in An Nasirah
and we will plan the next step with you

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp