Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Husain

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Husain

Bathroom waterproofing before tiling in Al Husain starts with a WhatsApp message with photos of the floor, walls and corners. The district has old and new residential buildings, and every bathroom needs a waterproof membrane protecting the surface and wet walls before tiling.

Bathrooms in Al Husain vary widely; some are in old buildings with irregular walls and floors, others in newer buildings with even surfaces. Older walls may have cracks or salt deposits, and floors may have dips or rises. The waterproof membrane must bond strongly to a clean, dry surface and fill every crack and gap. Photos show the surface condition and repairs that may be needed before application.

  • Al Husain is a district in the Eastern Province near Al Bahari, Az Zarah and Al Qudayh, with residential buildings of many ages.
  • An old building may have salt deposits on bathroom walls, which can affect how well the waterproof membrane adheres.
What the service includes

What the service covers in Al Husain

  • Forming and treating the floor-to-wall corners before the main layer
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Applying the membrane over the full floor and up the walls in the wet zone
  • Cleaning the surface, removing loose parts and treating hairline cracks
How we work

How we carry out bathroom waterproofing before tiling in Al Husain

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

Start from Al Husain with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Your request from Al Husain comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bathroom waterproofing before tiling in Al Husain

Do salt deposits affect membrane adhesion in Al Husain bathrooms?

Yes, salt deposits can prevent the membrane sticking well. The surface must be carefully cleaned first to remove salt and dirt. Photos will show us if there is salt, and we will tell you the right cleaning method.

Can cracked walls be repaired before waterproofing a bathroom in Al Husain?

Yes, large cracks need repair first so the membrane sticks properly. We may suggest a specialist or help you ourselves. Send close photos of the cracks so we can decide the best way to treat them.

Do you cover Al Husain?

Yes. We serve Al Husain and nearby areas such as Al Bahari, Az Zarah and Al Qudayh (near Qatif), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: Al Bahari, Az Zarah and Al Qudayh (near Qatif).

Other services in the area

More services in Al Husain

Worker applying the white insulation layer on a villa roof by the sea

Your first step in Al Husain:
a call or a WhatsApp message

Call us or send photos of the bathroom and the floor on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp