Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Jamiyin District

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Jamiyin District

Bathroom waterproofing before tiling in Al Jamiyin District starts with a photo of the floor and wet walls sent by call or WhatsApp. The district has villas and residential apartment blocks, where bathrooms need solid protection before any finish is applied.

Al Jamiyin mixes detached houses with apartment blocks, and bathrooms vary by age, size and layout. A modern bathroom may have both a shower and a tub, while older ones are often smaller with ageing pipes. Moisture from hot and cold water stresses walls and floor, and a waterproof layer before tiling stops water seeping into the concrete and the structure below. The photos show the area to be sealed and the surface condition to choose the right method.

  • Al Jamiyin District is a residential district in the Eastern Province, lying between Az Zahrah, Al Iskan First and Al Hamra First districts, with a mix of houses and apartment blocks.
  • A bathroom in any house or apartment faces daily moisture, and water finds its way into any cracks or gaps in the floor or walls.
What the service includes

What we do for you in Al Jamiyin District

  • Forming and treating the floor-to-wall corners before the main layer
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Cleaning the surface, removing loose parts and treating hairline cracks
How we work

The steps of bathroom waterproofing before tiling in Al Jamiyin District

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

We serve Al Jamiyin District and around itIncluding Az Zahrah District, Al Iskan First District and Al Hamra First District, as part of our work across the Eastern Province.

Your request from Al Jamiyin District comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bathroom waterproofing before tiling in Al Jamiyin District

Must old concrete be removed before waterproofing in Al Jamiyin?

It depends on the surface condition. If it is level and sound, removal may not be needed. Photos show whether deep cracks or crumbling require removing the old layer or if cleaning alone is enough.

How long must we wait after waterproofing before tiling starts?

The time depends on the material used and conditions. After we see the bathroom and surface photos, we will tell you how long to wait before the next step.

Do you offer bathroom waterproofing before tiling in Al Jamiyin District?

Yes. Al Jamiyin District is within our service area in the Eastern Province, and we also work in Az Zahrah District, Al Iskan First District and Al Hamra First District. Call us or send photos of the spot on WhatsApp.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

Does the surface need to be completely dry before the membrane is applied?

Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.

Nearby areas

The same service in nearby areas

We also offer bathroom waterproofing before tiling in Az Zahrah District, Al Iskan First District and Al Hamra First District, among the closest areas to Al Jamiyin District.

Other services in the area

More services in Al Jamiyin District

Worker applying the white insulation layer on a villa roof by the sea

We start with you in Al Jamiyin District
with one call

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp