Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Haras Al Watani

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Haras Al Watani

Bathroom waterproofing before tiling in Al Haras Al Watani starts with photos of the floor and the walls around the shower, sent by call or WhatsApp. The residential streets here mix apartments and villas, and the membrane depends on whether the floor sits on existing concrete or on a raised slab.

Buildings here range from apartments in residential blocks to multi-storey villas, and each bathroom ties into horizontal drains beneath the floor. Where a bathroom was tiled without a membrane, dampness usually appears at the edges and joints. Ground-floor and upper-floor bathrooms are built differently, so the photos show where the continuous membrane must run up the wet-area walls.

  • Al Haras Al Watani is a residential district in Hofuf in the Eastern Province, close to Al Qashlah, Sports City and Al Qusur.
  • A floor tiled without a membrane lets water pass into the layers below over time.
What the service includes

The scope of the work in Al Haras Al Watani

  • Applying the membrane over the full floor and up the walls in the wet zone
  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Forming and treating the floor-to-wall corners before the main layer
How we work

The stages of the work in Al Haras Al Watani

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

Start from Al Haras Al Watani with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Your request from Al Haras Al Watani comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bathroom waterproofing before tiling in Al Haras Al Watani

Can an apartment bathroom in Al Haras Al Watani be waterproofed before new tiles go in?

Yes, provided the concrete beneath the tiles is sound. The photos show this, and then the continuous membrane goes on the floor and wet-area walls before adhesive and tiles.

What decides the method for villas in Al Haras Al Watani?

The bathroom's position, ground or upper floor, and the condition of the existing joints decide it. The photos reveal both before any method is chosen.

What is the difference between a cementitious coating and a liquid membrane in a bathroom?

The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

What should I send you from Al Haras Al Watani?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Haras Al Watani, and we will work out the next step with you.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

Nearby areas

Areas near Al Haras Al Watani

We also offer bathroom waterproofing before tiling in Al Qashlah, Sports City (near Al Khobar) and Al Qusur, among the closest areas to Al Haras Al Watani.

Other services in the area

More services in Al Haras Al Watani

Worker applying the white insulation layer on a villa roof by the sea

Tell us about your site in Al Haras Al Watani
and we will plan the next step with you

Describe the problem and where it is in Al Haras Al Watani, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp