
Bathroom waterproofing before tiling in Al Fiwan
In Al Fiwan we waterproof bathrooms before tiling, laying a continuous membrane over the floor and the walls of wet areas, starting from photos sent by call or WhatsApp. Al Fiwan is a small settlement of scattered homes and farms, and each house needs its own check.
Al Fiwan combines scattered homes with small farms, and its bathrooms are sometimes added as a separate section after the house was built. In houses with widely spaced walls, dampness usually appears where the wall meets the floor and around the water outlets. Conditions around a farm can differ from a town, so the photos decide what is needed before a decision.
- Al Fiwan is a small settlement in Al-Ahsa within the Eastern Province, close to Ash Shifa and Al Jamiah.
- Bathrooms added to a house later often have their weakest waterproofing where the two parts meet.
What the service covers in Al Fiwan
- Checking the floor, the render, the corners, the drain outlet and pipe sleeves
- Cleaning the surface, removing loose parts and treating hairline cracks
- Sealing around the drain outlet, the door threshold and all pipe sleeves
- Applying the membrane over the full floor and up the walls in the wet zone
The steps of bathroom waterproofing before tiling in Al Fiwan
Send photos of the bathroom
On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.
Prepare the surface
The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.
Apply the membrane
The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.
Dry, then tiling begins
The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.
Why Abraj Al Azl?
Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.
We serve Al Fiwan and around itIncluding Ash Shifa (near Hafar Al-Batin), Al Jamiah (near Qaisumah) and Ghirnatah (near Hafar Al-Batin), as part of our work across the Eastern Province.
Al Fiwan is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
أفضل شركة عزل اسطح الفوم وخزانات المياه
Real Google reviews, shown exactly as their authors wrote them.
Your questions on bathroom waterproofing before tiling in Al Fiwan
Is waterproofing suitable for a bathroom added to a farm in Al Fiwan?
Yes, provided the floor and walls are sound. The photos show where the bathroom joins the original house, and that joint is addressed before the membrane goes on.
Do you treat dampness at water outlets in Al Fiwan?
Yes, we serve Al Fiwan. Send photos of the outlets and their surroundings, and we will tell you whether the fault lies in the membrane itself or in the fitting around it.
Is Al Fiwan within your service area?
Yes, Al Fiwan is one of the areas we work in, as are Ash Shifa (near Hafar Al-Batin), Al Jamiah (near Qaisumah) and Ghirnatah (near Hafar Al-Batin). To start, call us or message us on WhatsApp.
What decides the cost of waterproofing a bathroom before tiling?
The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.
Does the surface need to be completely dry before the membrane is applied?
Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.
What is the difference between a cementitious coating and a liquid membrane in a bathroom?
The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.
Bathroom waterproofing before tiling near Al Fiwan
We also work near Al Fiwan, in Ash Shifa (near Hafar Al-Batin), Al Jamiah (near Qaisumah) and Ghirnatah (near Hafar Al-Batin).
More services in Al Fiwan



