Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Firdaws (near Al Fadili)

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Firdaws (near Al Fadili)

Bathroom waterproofing before tiling in Al Firdaws starts with WhatsApp photos of the floor and wet walls. The district has villas and residential buildings where bathrooms are new or older, and the foundation before tiling is a continuous waterproof membrane protecting the structure from damp.

Bathrooms in Al Firdaws vary between new villas and older or mid-age apartment buildings. A new villa bathroom may need comprehensive waterproofing from scratch, whilst an older building may show damp in the walls below old tiles that must be treated first. Photos reveal the surface state, cracks and former water seepage spots, which determine where and how thick the membrane should be.

  • Al Firdaws is a residential district in Al-Ahsa, Eastern Province, neighbouring Al Fayha, Al Quds and Al Farouq, with varied villas and apartment buildings.
  • A bathroom in an apartment needs waterproofing on both the floor and wet walls because water seeps from both directions.
What the service includes

The main items of bathroom waterproofing before tiling in Al Firdaws (near Al Fadili)

  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Forming and treating the floor-to-wall corners before the main layer
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Applying the membrane over the full floor and up the walls in the wet zone
How we work

How we carry out bathroom waterproofing before tiling in Al Firdaws (near Al Fadili)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

Your request from Al Firdaws (near Al Fadili) comes to usCall or WhatsApp on one number, and we answer you ourselves.

We serve Al Firdaws (near Al Fadili) and around itIncluding Al Fayha (near Al Fadili), Al Quds and Al Farouq, as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bathroom waterproofing before tiling in Al Firdaws (near Al Fadili)

Is pre-tiling waterproofing necessary for every bathroom in Al Firdaws?

Yes, a continuous waterproof membrane stops water penetrating the concrete and walls from inside. Without it, damp may appear in the next room or beneath the tiles. Photos will show the current building state and any damage.

How do you treat an old damp bathroom before new tiling in Al Firdaws?

We treat the damp and cracks first, then apply the continuous waterproof membrane to floor and walls. This ensures full protection from new water. Send photos and a call clarifies the exact state.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

Do you offer bathroom waterproofing before tiling in Al Firdaws (near Al Fadili)?

Yes. Al Firdaws (near Al Fadili) is within our service area in the Eastern Province, and we also work in Al Fayha (near Al Fadili), Al Quds and Al Farouq. Call us or send photos of the spot on WhatsApp.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

Nearby areas

We also offer it in neighbouring areas

We also offer bathroom waterproofing before tiling in Al Fayha (near Al Fadili), Al Quds and Al Farouq, among the closest areas to Al Firdaws (near Al Fadili).

Other services in the area

More services in Al Firdaws (near Al Fadili)

Worker applying the white insulation layer on a villa roof by the sea

Your first step in Al Firdaws (near Al Fadili):
a call or a WhatsApp message

Call us or send photos of the bathroom and the floor on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp