Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Quds

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Quds

Bathroom waterproofing before tiling in Al Quds starts with photos sent by call or WhatsApp. The district has houses and villas of different sizes and ages, and bathroom conditions vary by building age and materials used.

Al Quds is a residential district mixing older and relatively newer houses and villas. An older bathroom may have old seepage or moisture-soaked walls, while a newer one may only need re-waterproofing before new tiling. Walls and floors exposed to daily water need continuous protection from seepage to lower layers. Your photos show surface condition, joints and corners, helping us choose the right method with you.

  • Al Quds is a district in the Eastern Province, close to Al Andalus, Al Fayha and Al Farouq, with varied residential houses and villas.
  • A bathroom used several times daily exposes its walls and floor to temperature swings and continuous moisture condensation.
What the service includes

The scope of the work in Al Quds

  • Applying the membrane over the full floor and up the walls in the wet zone
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Forming and treating the floor-to-wall corners before the main layer
How we work

This is how we work in Al Quds

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

We serve Al Quds and around itIncluding Al Andalus (near Al Fadili), Al Fayha (near Al Fadili) and Al Farouq, as part of our work across the Eastern Province.

Start from Al Quds with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Quds

If a bathroom is old and damp, how do you treat it before waterproofing in Al Quds?

We start by cleaning the surface and removing any old tiling or damaged coating. Then we repair cracks and gaps and dry the surface before applying the waterproof membrane. Photos show if there is deeper damage needing extra repair.

Can you waterproof an existing bathroom in an old house without demolition?

Yes, we work on the floor and wet walls without touching load-bearing walls. We remove the current tiling, treat the surface and apply new waterproofing. Your photos show what is possible.

What is the difference between a cementitious coating and a liquid membrane in a bathroom?

The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

What should I send you from Al Quds?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Quds, and we will work out the next step with you.

Does the surface need to be completely dry before the membrane is applied?

Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.

Nearby areas

Bathroom waterproofing before tiling near Al Quds

If the site is outside Al Quds, the same service is available in Al Andalus (near Al Fadili), Al Fayha (near Al Fadili) and Al Farouq.

Other services in the area

More services in Al Quds

Worker applying the white insulation layer on a villa roof by the sea

Bathroom waterproofing before tiling in Al Quds?
Call us now

Describe the problem and where it is in Al Quds, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp