Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Anwar (near Mallahah)

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Anwar (near Mallahah)

Bathroom waterproofing before tiling in Al Anwar starts with a WhatsApp message containing photos of the bathroom and its dimensions. The district has houses and villas of varying ages, with different drainage and flooring systems, which affects the choice of waterproofing method.

Residential buildings in Al Anwar range from older villas to newer ones, each potentially requiring a different waterproofing approach. Bathrooms in older homes may face challenges with damp and joints, while newer homes may only need their protective membranes renewed. Coastal humidity and high summer heat increase the importance of laying a durable waterproof layer before tiling. Photos you send allow us to assess the bathroom condition accurately and choose the right material and method.

  • Al Anwar is a residential district in the Eastern Province, close to Al Aqiq and Mallahah, with various houses and villas.
  • Bathrooms in residential homes are exposed daily to high humidity and temperature variations, making a waterproof membrane essential before tiling.
What the service includes

The scope of the work in Al Anwar (near Mallahah)

  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Forming and treating the floor-to-wall corners before the main layer
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
How we work

This is how we work in Al Anwar (near Mallahah)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

We serve Al Anwar (near Mallahah) and around itIncluding Al Aqiq (near Inak), Mallahah and Halat Mahish, as part of our work across the Eastern Province.

Al Anwar (near Mallahah) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bathroom waterproofing before tiling in Al Anwar (near Mallahah)

Is waterproofing before tiling necessary in every bathroom in Al Anwar?

Yes, because bathrooms are exposed to direct water daily. Proper waterproofing protects the home's walls and foundation from damp and leaks. The photos you send show the bathroom condition and help us choose the best waterproofing method.

Can an old bathroom in Al Anwar be waterproofed before renovation?

Yes, we remove old tiles and materials first if needed, then apply a new waterproof layer to the floor and wet walls before tiling. Details depend on the surface condition and are visible from the photos.

What is the difference between a cementitious coating and a liquid membrane in a bathroom?

The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

How do I request bathroom waterproofing before tiling in Al Anwar (near Mallahah)?

Call us, or send clear photos of the spot and its location in Al Anwar (near Mallahah) on WhatsApp, and we will work out the next step with you.

Nearby areas

Areas near Al Anwar (near Mallahah)

If the site is outside Al Anwar (near Mallahah), the same service is available in Al Aqiq (near Inak), Mallahah and Halat Mahish.

Other services in the area

More services in Al Anwar (near Mallahah)

Worker applying the white insulation layer on a villa roof by the sea

Your first step in Al Anwar (near Mallahah):
a call or a WhatsApp message

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp