Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Mallahah

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Mallahah

We waterproof bathrooms before tiling in Mallahah, Eastern Province, with a continuous membrane on the floor and wet-area walls before adhesive and tiles go down. Send a photo of the bathroom by call or WhatsApp and we will settle the case together.

Mallahah is a village near the coast with standalone homes and some with gardens, and coastal humidity keeps interior walls damp for longer periods. Tiled bathrooms with untreated walls often show stains and flaking near the floor. The photos will show whether a wall needs drying and relining before new tiles go on.

  • Mallahah is a village in the Eastern Province near Al Jish and Ar Rayah, lying along the coastline.
  • A wall that stays damp on the coast needs enough time to dry before any new lining or tiling.
What the service includes

The main items of bathroom waterproofing before tiling in Mallahah

  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Applying the membrane over the full floor and up the walls in the wet zone
  • Forming and treating the floor-to-wall corners before the main layer
  • Cleaning the surface, removing loose parts and treating hairline cracks
How we work

The stages of the work in Mallahah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

We serve Mallahah and around itIncluding Al Jish (near Ar Rayah), Al Jish (near Mallahah) and Ar Rayah, as part of our work across the Eastern Province.

Start from Mallahah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bathroom waterproofing before tiling in Mallahah

Does a wall in Mallahah need drying before the bathroom is waterproofed?

Yes, since a damp wall does not bond well with lining. We judge the level of moisture from the photos and then set out the order of steps.

Does coastal humidity cause a recurring problem in Mallahah bathrooms?

Humidity keeps walls wet for longer, so its effect appears at the floor and corners. The photos show whether it is the cause in your case or something else.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

What should I send you from Mallahah?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Mallahah, and we will work out the next step with you.

Nearby areas

Areas near Mallahah

If the site is outside Mallahah, the same service is available in Al Jish (near Ar Rayah), Al Jish (near Mallahah) and Ar Rayah.

Other services in the area

More services in Mallahah

Worker applying the white insulation layer on a villa roof by the sea

Bathroom waterproofing before tiling in Mallahah?
Call us now

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp