Abraj Al AzlContracting
Call العربية
Bathroom floor and wall base brushed with a grey waterproof coat before tiling

Bathroom waterproofing in Ar Raja

Sealed before the leak shows

Waterproofing bathroom and washroom floors, wall bases and drain openings, at the build stage or after tiling

+966 54 311 2066
The service in your area

Bathroom waterproofing in Ar Raja

We provide bathroom waterproofing in the Ar Raja district of Al Ahsa, covering floors, wall bases and drain openings. The work suits both new construction and bathrooms that are already tiled, and it begins with photos sent by call or WhatsApp.

Ar Raja is made up largely of villas and mid-sized homes, and its bathrooms range from new to ones that have been in use for some time. Leaks tend to appear near the wall base and around the floor drain, which usually need the most attention. In tiled bathrooms the grout is checked before any layer is applied, and the photos reveal whether the treatment covers one spot or the whole floor.

  • Ar Raja is a residential district in Al Ahsa Governorate in the Eastern Province, close to Ash Sheraa, Al Kawthar and Al Maha.
  • Water in bathrooms usually gathers at the drain and wall base, because the floor slope directs it there.
What the service includes

The main items of bathroom waterproofing in Ar Raja

  • Treating washroom floors and wet surfaces with the material suited to each condition
  • Leaving the layer to cure before any finish goes over it
  • Checking the floor, wall bases, corners and the drain opening
  • Applying a continuous waterproof layer rising at walls and corners
How we work

The steps of bathroom waterproofing in Ar Raja

1

Send photos of the bathroom

On WhatsApp: photos of the floor, wall bases, the drain opening, pipe entries and any visible damp, so we can read the stage and choose the right treatment.

2

Inspect and choose the treatment

The surface is checked for the condition of the render, any cracks, pipe openings and the drain. From what is found, the waterproofing material and the stage are decided.

3

Prepare the surface and treat cracks

The surface is cleaned and dried, cracks are treated, pipe openings and the drain ring are closed, and the surface is left ready to take the waterproof layer.

4

Apply the layer and let it cure

The layer covers the floor, rises at the wall bases, the corners and the door threshold, and is left to cure fully before any finish goes over it.

What sets us apart

Why Abraj Al Azl?

Protects the rooms and ceiling belowA continuous layer stops water moving to the ceiling below the bathroom or to the wall of the room next to it.

Your request from Ar Raja comes to usCall or WhatsApp on one number, and we answer you ourselves.

We serve Ar Raja and around itIncluding Ash Sheraa, Al Kawthar (near Dhahran) and Al Maha (near Dhahran), as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bathroom waterproofing in Ar Raja

Does a newly built bathroom in Ar Raja need separate waterproofing?

It is best done during construction before the tiles go down, since the floor is easier to reach then. We confirm the right approach once we have seen the photos and the build stage.

What should I send you about a bathroom in Ar Raja?

Send photos of the floor, the wall base and the drain, along with where the damp appears. These usually show whether the problem is confined to one spot or affects the whole layer.

What is the difference between waterproofing before and after tiling?

Before tiling, the layer goes onto a clean open surface and covers everything fully, which is the best outcome. After tiling, the situation is assessed: if grout joints and cracks are the problem, treatment from above may work; if the original layer is absent or damaged, the tiles may need to come up. Photos help us decide which fits.

Is Ar Raja within your service area?

Yes, Ar Raja is one of the areas we work in, as are Ash Sheraa, Al Kawthar (near Dhahran) and Al Maha (near Dhahran). To start, call us or message us on WhatsApp.

Can the bathroom floor be waterproofed without lifting the tiles?

In some cases yes: if joints and cracks are limited and the tile surface is sound, sealing the joints or applying a clear waterproof coat over the tiles can work. But if the layer under the tiles is missing or the leak is advanced, lifting them is the right treatment. Send photos and we will advise.

What materials are used in bathroom waterproofing?

Common materials include flexible cementitious coating applied in layers on damp-tolerant surfaces, liquid membrane applied by brush or roller and shaped by the surface, and bitumen rolls fixed to the floor and wall bases. The choice of material depends on the stage of the work and the nature of the surface.

Nearby areas

Bathroom waterproofing near Ar Raja

Nearby areas we also cover: Ash Sheraa, Al Kawthar (near Dhahran) and Al Maha (near Dhahran).

Other services in the area

More services in Ar Raja

Two workers on the roof insulating around an AC unit

Tell us about your site in Ar Raja
and we will plan the next step with you

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp