Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Ar Raja

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Ar Raja

Bathroom waterproofing before tiling in Ar Raja begins with photos of the floor and shower walls, sent by call or WhatsApp. Buildings here range from detached houses to apartments, and each needs a continuous waterproof layer before tiles go down.

The neighbourhood has detached houses and small apartment blocks, and in some homes the bathroom sits on an older concrete slab that was never waterproofed. Attention usually falls on the area around the shower and toilet, where water collects most. The photos show whether one membrane can cover the floor and walls to the right height, or whether the surface needs extra preparation.

  • Ar Raja is a district in Al Ahsa in the Eastern Province, lying close to Ash Sheraa and Al Kawthar.
  • Shower walls take more moisture than the rest of the bathroom, so they need waterproofing carried higher.
What the service includes

The main items of bathroom waterproofing before tiling in Ar Raja

  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Cleaning the surface, removing loose parts and treating hairline cracks
How we work

The steps of bathroom waterproofing before tiling in Ar Raja

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

Start from Ar Raja with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Ar Raja is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bathroom waterproofing before tiling in Ar Raja

Must the walls be waterproofed as well as the floor in Ar Raja?

Around the shower, yes, since water reaches the walls as well as the floor. Elsewhere, protecting the floor and the splash zone is usually enough, and the photos will show what suits your bathroom.

Can tiling go straight on after waterproofing in Ar Raja?

The membrane must dry fully before adhesive and tiles go on, and the time varies with conditions. We will confirm this with you after reviewing the photos.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

How do I request bathroom waterproofing before tiling in Ar Raja?

Call us, or send clear photos of the spot and its location in Ar Raja on WhatsApp, and we will work out the next step with you.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

Nearby areas

Areas near Ar Raja

Nearby areas we also cover: Ash Sheraa, Al Kawthar (near Dhahran) and Al Maha (near Dhahran).

Other services in the area

More services in Ar Raja

Worker applying the white insulation layer on a villa roof by the sea

Bathroom waterproofing before tiling in Ar Raja?
Call us now

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp