Abraj Al AzlContracting
Call العربية
Bathroom floor and wall base brushed with a grey waterproof coat before tiling

Bathroom waterproofing in An Naqa

Sealed before the leak shows

Waterproofing bathroom and washroom floors, wall bases and drain openings, at the build stage or after tiling

+966 54 311 2066
The service in your area

Bathroom waterproofing in An Naqa

We start bathroom waterproofing in An Naqa with photos of the floor, walls, joints and leaks sent by call or WhatsApp. The district has various housing types, and waterproofing varies depending on the bathroom's location and existing structure.

An Naqa consists of villas of varying sizes and apartment buildings, many of which have been standing for years. A ground-floor bathroom can direct moisture into the foundation if not well waterproofed, while an upper-floor one may cause leaks to the units below. Pipes and joints attached to older structures need careful inspection, and photos help identify the right treatment without guesswork.

  • An Naqa is a residential district in the Eastern Province, close to Ad Dirah Two, Al Khisab and An Noor.
  • A bathroom in an apartment building can transmit dampness between floors if the floor membrane is not properly waterproofed.
What the service includes

What the service covers in An Naqa

  • Treating washroom floors and wet surfaces with the material suited to each condition
  • Closing the drain opening ring and the bathroom door threshold
  • Applying a continuous waterproof layer rising at walls and corners
  • Leaving the layer to cure before any finish goes over it
How we work

From first contact to the finished job in An Naqa

1

Send photos of the bathroom

On WhatsApp: photos of the floor, wall bases, the drain opening, pipe entries and any visible damp, so we can read the stage and choose the right treatment.

2

Inspect and choose the treatment

The surface is checked for the condition of the render, any cracks, pipe openings and the drain. From what is found, the waterproofing material and the stage are decided.

3

Prepare the surface and treat cracks

The surface is cleaned and dried, cracks are treated, pipe openings and the drain ring are closed, and the surface is left ready to take the waterproof layer.

4

Apply the layer and let it cure

The layer covers the floor, rises at the wall bases, the corners and the door threshold, and is left to cure fully before any finish goes over it.

What sets us apart

Why Abraj Al Azl?

Protects the rooms and ceiling belowA continuous layer stops water moving to the ceiling below the bathroom or to the wall of the room next to it.

An Naqa is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We serve An Naqa and around itIncluding Ad Dirah Two, Al Khisab and An Noor (near Sayhat), as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bathroom waterproofing in An Naqa

Can a bathroom leak in an upper floor be fixed without disturbing neighbours in An Naqa?

It depends on the leak's source. If it is only from joints, major drilling may not be needed. Send photos of the dampness and leak, and we will identify the least disruptive method.

Does older construction in An Naqa need stronger waterproofing than new construction?

Older structures often have weakness in the base materials, so crack repair may be needed before waterproofing. Photos show the structure's condition and whether additional treatment is needed.

What is the difference between waterproofing before and after tiling?

Before tiling, the layer goes onto a clean open surface and covers everything fully, which is the best outcome. After tiling, the situation is assessed: if grout joints and cracks are the problem, treatment from above may work; if the original layer is absent or damaged, the tiles may need to come up. Photos help us decide which fits.

What materials are used in bathroom waterproofing?

Common materials include flexible cementitious coating applied in layers on damp-tolerant surfaces, liquid membrane applied by brush or roller and shaped by the surface, and bitumen rolls fixed to the floor and wall bases. The choice of material depends on the stage of the work and the nature of the surface.

Do you offer bathroom waterproofing in An Naqa?

Yes. An Naqa is within our service area in the Eastern Province, and we also work in Ad Dirah Two, Al Khisab and An Noor (near Sayhat). Call us or send photos of the spot on WhatsApp.

What decides the cost of waterproofing a bathroom?

The floor and wall area to be waterproofed, the stage of the work (before or after tiling), how many cracks and pipe entries there are, whether the tiles must come up, and how accessible the site is. Send photos and rough dimensions on WhatsApp and we will suggest the right treatment.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: Ad Dirah Two, Al Khisab and An Noor (near Sayhat).

Other services in the area

More services in An Naqa

Two workers on the roof insulating around an AC unit

Your first step in An Naqa:
a call or a WhatsApp message

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp