Abraj Al AzlContracting
Call العربية
Bathroom floor and wall base brushed with a grey waterproof coat before tiling

Bathroom waterproofing in Al Wasadah

Sealed before the leak shows

Waterproofing bathroom and washroom floors, wall bases and drain openings, at the build stage or after tiling

+966 54 311 2066
The service in your area

Bathroom waterproofing in Al Wasadah

We waterproof bathroom floors, wall bases and drain openings in Al Wasadah, at the build stage or after tiling. Send a photo of the bathroom by call or WhatsApp and we will settle the method once we have seen it.

Al Wasadah has a mix of newer houses and older ones, and bathrooms are usually inside the living units or beside bedrooms. Tiling over an unlined floor often brings back dampness in the corners near the drain. The right lining depends on whether the floor is exposed or already covered, and the photos make that clear before any choice is made.

  • Al Wasadah is a district in the Al-Ahsa governorate of the Eastern Province, near Bab As Sab, Al Bustan Two and Al Madani.
  • A wall meeting an unlined bathroom floor gets wet at its base before any stain shows on the paint.
What the service includes

What we do for you in Al Wasadah

  • Cleaning the surface and treating hairline cracks and pipe entries
  • Applying a continuous waterproof layer rising at walls and corners
  • Leaving the layer to cure before any finish goes over it
  • Treating washroom floors and wet surfaces with the material suited to each condition
How we work

How we carry out bathroom waterproofing in Al Wasadah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, wall bases, the drain opening, pipe entries and any visible damp, so we can read the stage and choose the right treatment.

2

Inspect and choose the treatment

The surface is checked for the condition of the render, any cracks, pipe openings and the drain. From what is found, the waterproofing material and the stage are decided.

3

Prepare the surface and treat cracks

The surface is cleaned and dried, cracks are treated, pipe openings and the drain ring are closed, and the surface is left ready to take the waterproof layer.

4

Apply the layer and let it cure

The layer covers the floor, rises at the wall bases, the corners and the door threshold, and is left to cure fully before any finish goes over it.

What sets us apart

Why Abraj Al Azl?

Protects the concrete and the reinforcementWater that reaches the reinforcement starts rust from inside, and repairing that later costs far more than waterproofing when it should be done.

We serve Al Wasadah and around itIncluding Bab As Sab, Al Bustan Two and Al Madani, as part of our work across the Eastern Province.

Bathroom waterproofing in Al WasadahWe choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Wasadah

Should a bathroom in Al Wasadah be lined before or after tiling?

Before tiling is better because it protects the floor beneath the tiles. If the tiles are already down, treatment from above can be done at specific points, and the photos will show which suits your bathroom.

What decides the waterproofing method for a bathroom in Al Wasadah?

It depends on the state of the floor and wall, the drain's position and whether tiles are in place. Send photos of these areas and we will find together what fits your bathroom.

What is the difference between waterproofing before and after tiling?

Before tiling, the layer goes onto a clean open surface and covers everything fully, which is the best outcome. After tiling, the situation is assessed: if grout joints and cracks are the problem, treatment from above may work; if the original layer is absent or damaged, the tiles may need to come up. Photos help us decide which fits.

What decides the cost of waterproofing a bathroom?

The floor and wall area to be waterproofed, the stage of the work (before or after tiling), how many cracks and pipe entries there are, whether the tiles must come up, and how accessible the site is. Send photos and rough dimensions on WhatsApp and we will suggest the right treatment.

Is Al Wasadah within your service area?

Yes, Al Wasadah is one of the areas we work in, as are Bab As Sab, Al Bustan Two and Al Madani. To start, call us or message us on WhatsApp.

Why does damp appear on the ceiling of the room below the bathroom?

Water gets in through the drain opening, pipe entries or the corner between the floor and the wall, then travels horizontally inside the slab until it appears somewhere else. The stain on the ceiling can be far from the actual entry point. Photos from above and below help us trace the source.

Nearby areas

Areas near Al Wasadah

If the site is outside Al Wasadah, the same service is available in Bab As Sab, Al Bustan Two and Al Madani.

Other services in the area

More services in Al Wasadah

Two workers on the roof insulating around an AC unit

Your first step in Al Wasadah:
a call or a WhatsApp message

Describe the problem and where it is in Al Wasadah, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp