Abraj Al AzlContracting
Call العربية
Bathroom floor and wall base brushed with a grey waterproof coat before tiling

Bathroom waterproofing in Al Qurayn

Sealed before the leak shows

Waterproofing bathroom and washroom floors, wall bases and drain openings, at the build stage or after tiling

+966 54 311 2066
The service in your area

Bathroom waterproofing in Al Qurayn

We waterproof bathrooms in the Al Qurayn district of Al Ahsa, covering floors, water entry points, wall bases and drain openings. Work can be done during construction or after tiling, and it starts with photos sent by call or WhatsApp.

Al Qurayn is largely made up of ground-floor houses and homes built over wide plots, with buildings dating from several different periods. In older homes the floor concrete is more prone to cracking around pipe entries, so those points are examined first. The district lies close to Ash Shuqayq, Julayjilah and Ash Shibah, and the photos show whether the work is limited to one spot or extends across the floor.

  • Al Qurayn is a residential district in Al Ahsa Governorate in the Eastern Province, close to Ash Shuqayq, Julayjilah and Ash Shibah.
  • In ground-floor homes water often gets in around pipe entries into the floor, rather than through the middle of the tiles.
What the service includes

What we do for you in Al Qurayn

  • Closing the drain opening ring and the bathroom door threshold
  • Cleaning the surface and treating hairline cracks and pipe entries
  • Treating washroom floors and wet surfaces with the material suited to each condition
  • Checking the floor, wall bases, corners and the drain opening
How we work

The stages of the work in Al Qurayn

1

Send photos of the bathroom

On WhatsApp: photos of the floor, wall bases, the drain opening, pipe entries and any visible damp, so we can read the stage and choose the right treatment.

2

Inspect and choose the treatment

The surface is checked for the condition of the render, any cracks, pipe openings and the drain. From what is found, the waterproofing material and the stage are decided.

3

Prepare the surface and treat cracks

The surface is cleaned and dried, cracks are treated, pipe openings and the drain ring are closed, and the surface is left ready to take the waterproof layer.

4

Apply the layer and let it cure

The layer covers the floor, rises at the wall bases, the corners and the door threshold, and is left to cure fully before any finish goes over it.

What sets us apart

Why Abraj Al Azl?

Protects the rooms and ceiling belowA continuous layer stops water moving to the ceiling below the bathroom or to the wall of the room next to it.

Your request from Al Qurayn comes to usCall or WhatsApp on one number, and we answer you ourselves.

Bathroom waterproofing in Al QuraynWe choose the method and the materials once we know the condition of the spot.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bathroom waterproofing in Al Qurayn

Do you treat pipe entries in a bathroom of a house in Al Qurayn?

Yes, pipe entries are among the most common leak points in ground-floor houses, and we check them as part of the work. The photos show whether the crack needs treating.

Is bathroom waterproofing suitable during the construction of a new house in Al Qurayn?

Yes, working before tiles are laid makes the floor and entry points easier to reach. Tell us the build stage and send photos so we can settle on the right approach.

How do I request bathroom waterproofing in Al Qurayn?

Call us, or send clear photos of the spot and its location in Al Qurayn on WhatsApp, and we will work out the next step with you.

What decides the cost of waterproofing a bathroom?

The floor and wall area to be waterproofed, the stage of the work (before or after tiling), how many cracks and pipe entries there are, whether the tiles must come up, and how accessible the site is. Send photos and rough dimensions on WhatsApp and we will suggest the right treatment.

What is the difference between waterproofing before and after tiling?

Before tiling, the layer goes onto a clean open surface and covers everything fully, which is the best outcome. After tiling, the situation is assessed: if grout joints and cracks are the problem, treatment from above may work; if the original layer is absent or damaged, the tiles may need to come up. Photos help us decide which fits.

Why does damp appear on the ceiling of the room below the bathroom?

Water gets in through the drain opening, pipe entries or the corner between the floor and the wall, then travels horizontally inside the slab until it appears somewhere else. The stain on the ceiling can be far from the actual entry point. Photos from above and below help us trace the source.

Nearby areas

We also offer it in neighbouring areas

We also work near Al Qurayn, in Ash Shuqayq, Julayjilah and Ash Shibah.

Other services in the area

More services in Al Qurayn

Two workers on the roof insulating around an AC unit

Tell us about your site in Al Qurayn
and we will plan the next step with you

Describe the problem and where it is in Al Qurayn, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp