Abraj Al AzlContracting
Call العربية
Bathroom floor and wall base brushed with a grey waterproof coat before tiling

Bathroom waterproofing in Al Quds

Sealed before the leak shows

Waterproofing bathroom and washroom floors, wall bases and drain openings, at the build stage or after tiling

+966 54 311 2066
The service in your area

Bathroom waterproofing in Al Quds

Bathroom waterproofing in Al Quds starts with WhatsApp messages containing photos of the floor, walls and drains. The district has various villas and residential buildings, where bathrooms need protection from water leaks at the build stage or after tiling is complete.

Bathrooms in Al Quds vary between modern villas with separate layouts and mixed-use residential buildings. A villa bathroom may be at ground level or raised, and walls face constant humidity especially around shower areas and sloped floors. Drain openings also need extra protection where pipes enter. The photos show whether waterproofing is needed before tiling or afterwards, which affects the choice of materials and method.

  • Al Quds is a district in the Eastern Province, lying close to Al Andalus, Al Fayha and Al Farouq, with a mix of villas and residential buildings.
  • Bathroom walls exposed to moisture need waterproofing at all levels from the floor to below the tiling to prevent water penetration.
What the service includes

What the service covers in Al Quds

  • Checking the floor, wall bases, corners and the drain opening
  • Closing the drain opening ring and the bathroom door threshold
  • Applying a continuous waterproof layer rising at walls and corners
  • Treating washroom floors and wet surfaces with the material suited to each condition
How we work

From first contact to the finished job in Al Quds

1

Send photos of the bathroom

On WhatsApp: photos of the floor, wall bases, the drain opening, pipe entries and any visible damp, so we can read the stage and choose the right treatment.

2

Inspect and choose the treatment

The surface is checked for the condition of the render, any cracks, pipe openings and the drain. From what is found, the waterproofing material and the stage are decided.

3

Prepare the surface and treat cracks

The surface is cleaned and dried, cracks are treated, pipe openings and the drain ring are closed, and the surface is left ready to take the waterproof layer.

4

Apply the layer and let it cure

The layer covers the floor, rises at the wall bases, the corners and the door threshold, and is left to cure fully before any finish goes over it.

What sets us apart

Why Abraj Al Azl?

Protects the rooms and ceiling belowA continuous layer stops water moving to the ceiling below the bathroom or to the wall of the room next to it.

We serve Al Quds and around itIncluding Al Andalus (near Al Fadili), Al Fayha (near Al Fadili) and Al Farouq, as part of our work across the Eastern Province.

Al Quds is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bathroom waterproofing in Al Quds

Can a bathroom in Al Quds be waterproofed after tiling is finished?

Yes, but the method differs. After tiling, cracks, joints and existing drains are treated, and waterproofing effectiveness depends on the substrate under the tiles. Send photos of the affected areas so we can determine the best solution.

What is the difference between waterproofing before and after tiling?

Before tiling, waterproofing covers the entire surface with an even layer, offering complete protection. After tiling, it focuses on joints and exposed areas and may not reach every point. Photos show the bathroom's current condition and what can be achieved.

Do you cover Al Quds?

Yes. We serve Al Quds and nearby areas such as Al Andalus (near Al Fadili), Al Fayha (near Al Fadili) and Al Farouq, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

How often should a bathroom be waterproofed in a building's life?

There is no fixed interval. The layer is affected by how well it was first applied, by movement in the building, by shocks to the tiles and by changes to the plumbing. The main signal is damp patches appearing or render crumbling at the wall base, not a date. At the first sign, send us a photo.

What materials are used in bathroom waterproofing?

Common materials include flexible cementitious coating applied in layers on damp-tolerant surfaces, liquid membrane applied by brush or roller and shaped by the surface, and bitumen rolls fixed to the floor and wall bases. The choice of material depends on the stage of the work and the nature of the surface.

What decides the cost of waterproofing a bathroom?

The floor and wall area to be waterproofed, the stage of the work (before or after tiling), how many cracks and pipe entries there are, whether the tiles must come up, and how accessible the site is. Send photos and rough dimensions on WhatsApp and we will suggest the right treatment.

Nearby areas

Bathroom waterproofing near Al Quds

We also offer bathroom waterproofing in Al Andalus (near Al Fadili), Al Fayha (near Al Fadili) and Al Farouq, among the closest areas to Al Quds.

Other services in the area

More services in Al Quds

Two workers on the roof insulating around an AC unit

Tell us about your site in Al Quds
and we will plan the next step with you

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp