Abraj Al AzlContracting
Call العربية
Bathroom floor and wall base brushed with a grey waterproof coat before tiling

Bathroom waterproofing in Al Lisafah

Sealed before the leak shows

Waterproofing bathroom and washroom floors, wall bases and drain openings, at the build stage or after tiling

+966 54 311 2066
The service in your area

Bathroom waterproofing in Al Lisafah

We waterproof bathroom and washroom floors, wall bases and drain openings in Al Lisafah. The process starts with photos of the space sent by call or WhatsApp, which show whether waterproofing is needed before tiling or after it.

Al Lisafah is a village of detached houses and small farms, where bathrooms are often built in stages. Dampness usually appears at the wall base and around the drain if the floor was not waterproofed before tiling. A bathroom not yet tiled differs from one tiled years ago, so the photos show which applies to your space.

  • Al Lisafah is a village in the Al-Ahsa governorate of the Eastern Province, close to Umm ash Shifallah, Al Qara' and Al Hayra.
  • In tiled bathrooms water usually enters through grout lines and joints rather than through the tiles themselves.
What the service includes

What we do for you in Al Lisafah

  • Treating washroom floors and wet surfaces with the material suited to each condition
  • Applying a continuous waterproof layer rising at walls and corners
  • Leaving the layer to cure before any finish goes over it
  • Closing the drain opening ring and the bathroom door threshold
How we work

The steps of bathroom waterproofing in Al Lisafah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, wall bases, the drain opening, pipe entries and any visible damp, so we can read the stage and choose the right treatment.

2

Inspect and choose the treatment

The surface is checked for the condition of the render, any cracks, pipe openings and the drain. From what is found, the waterproofing material and the stage are decided.

3

Prepare the surface and treat cracks

The surface is cleaned and dried, cracks are treated, pipe openings and the drain ring are closed, and the surface is left ready to take the waterproof layer.

4

Apply the layer and let it cure

The layer covers the floor, rises at the wall bases, the corners and the door threshold, and is left to cure fully before any finish goes over it.

What sets us apart

Why Abraj Al Azl?

Protects the concrete and the reinforcementWater that reaches the reinforcement starts rust from inside, and repairing that later costs far more than waterproofing when it should be done.

Al Lisafah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Start from Al Lisafah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bathroom waterproofing in Al Lisafah

Can a tiled bathroom in Al Lisafah be waterproofed without breaking the tiles?

It depends on the condition of the layers beneath the tiles and the type of leak. Treating grout lines and drain openings is sometimes enough, and the photos show whether removal can be avoided.

Do you work on bathrooms in detached houses in Al Lisafah?

Yes, we serve Al Lisafah. Send photos of the bathroom, the wall base and the drain opening, and tell us whether it is at the build stage or already tiled so we can recommend the right step.

Is kitchen waterproofing different from bathroom waterproofing?

The principle is the same: a continuous layer under the tiles around wet areas and wall bases. But the risk points in a kitchen differ: around the sink, the dishwasher connection and the floor drain, and the need is greater in kitchens above living space. Each service covers its own details separately.

What decides the cost of waterproofing a bathroom?

The floor and wall area to be waterproofed, the stage of the work (before or after tiling), how many cracks and pipe entries there are, whether the tiles must come up, and how accessible the site is. Send photos and rough dimensions on WhatsApp and we will suggest the right treatment.

What is the difference between waterproofing before and after tiling?

Before tiling, the layer goes onto a clean open surface and covers everything fully, which is the best outcome. After tiling, the situation is assessed: if grout joints and cracks are the problem, treatment from above may work; if the original layer is absent or damaged, the tiles may need to come up. Photos help us decide which fits.

Do you offer bathroom waterproofing in Al Lisafah?

Yes. Al Lisafah is within our service area in the Eastern Province, and we also work in Umm ash Shifallah, Al Qara' and Al Hayra. Call us or send photos of the spot on WhatsApp.

Nearby areas

We also offer it in neighbouring areas

Nearby areas we also cover: Umm ash Shifallah, Al Qara' and Al Hayra.

Other services in the area

More services in Al Lisafah

Two workers on the roof insulating around an AC unit

Bathroom waterproofing in Al Lisafah?
Call us now

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp