Abraj Al AzlContracting
Call العربية
Bathroom floor and wall base brushed with a grey waterproof coat before tiling

Bathroom waterproofing in Al Jisr

Sealed before the leak shows

Waterproofing bathroom and washroom floors, wall bases and drain openings, at the build stage or after tiling

+966 54 311 2066
The service in your area

Bathroom waterproofing in Al Jisr

Bathroom waterproofing in Al Jisr covers the floor, wall bases and drain openings, whether the work is done at the build stage or after tiling. We serve Al Jisr in the Eastern Province, and the process starts with photos of the bathroom sent by call or on WhatsApp.

Al Jisr is largely made up of houses and small residential blocks, and many have bathrooms on upper floors where a leak through the slab first shows as a ceiling stain below. Some older homes were tiled before any membrane was laid, so water has reached the wall bases over the years. In these bathrooms the work depends on whether the floor is still sound and whether the drain sits at the correct level, and the photos show which case applies before any method is proposed.

  • Al Jisr is a district in the Eastern Province, with Ishbiliya, Al Hamra and Al Khuzama lying close by.
  • Bathrooms on upper floors often leak first into the ceiling below, so the floor membrane matters more than the tiles.
What the service includes

What the service covers in Al Jisr

  • Checking the floor, wall bases, corners and the drain opening
  • Cleaning the surface and treating hairline cracks and pipe entries
  • Leaving the layer to cure before any finish goes over it
  • Closing the drain opening ring and the bathroom door threshold
How we work

The steps of bathroom waterproofing in Al Jisr

1

Send photos of the bathroom

On WhatsApp: photos of the floor, wall bases, the drain opening, pipe entries and any visible damp, so we can read the stage and choose the right treatment.

2

Inspect and choose the treatment

The surface is checked for the condition of the render, any cracks, pipe openings and the drain. From what is found, the waterproofing material and the stage are decided.

3

Prepare the surface and treat cracks

The surface is cleaned and dried, cracks are treated, pipe openings and the drain ring are closed, and the surface is left ready to take the waterproof layer.

4

Apply the layer and let it cure

The layer covers the floor, rises at the wall bases, the corners and the door threshold, and is left to cure fully before any finish goes over it.

What sets us apart

Why Abraj Al Azl?

Protects the rooms and ceiling belowA continuous layer stops water moving to the ceiling below the bathroom or to the wall of the room next to it.

Al Jisr is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Bathroom waterproofing in Al JisrWe choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Jisr

Can a bathroom above a living room in Al Jisr be waterproofed?

Yes, that is a common case in homes here. The work is planned from photos of the floor, the drain and the room below, so we can see whether the membrane can go on the existing surface or needs preparing first.

Can a tiled bathroom in Al Jisr be assessed from photos?

Often yes, since clear photos of the floor edges, wall bases and drain can show a great deal. Tell us whether the tiles are cracked or hollow, as that decides whether part of them must come up.

Why does damp appear on the ceiling of the room below the bathroom?

Water gets in through the drain opening, pipe entries or the corner between the floor and the wall, then travels horizontally inside the slab until it appears somewhere else. The stain on the ceiling can be far from the actual entry point. Photos from above and below help us trace the source.

What decides the cost of waterproofing a bathroom?

The floor and wall area to be waterproofed, the stage of the work (before or after tiling), how many cracks and pipe entries there are, whether the tiles must come up, and how accessible the site is. Send photos and rough dimensions on WhatsApp and we will suggest the right treatment.

How do I request bathroom waterproofing in Al Jisr?

Call us, or send clear photos of the spot and its location in Al Jisr on WhatsApp, and we will work out the next step with you.

What is the difference between waterproofing before and after tiling?

Before tiling, the layer goes onto a clean open surface and covers everything fully, which is the best outcome. After tiling, the situation is assessed: if grout joints and cracks are the problem, treatment from above may work; if the original layer is absent or damaged, the tiles may need to come up. Photos help us decide which fits.

Nearby areas

The same service in nearby areas

We also work near Al Jisr, in Ishbiliya, Al Hamra (near Al Khobar) and Al Khuzama (near Al Khobar).

Other services in the area

More services in Al Jisr

Two workers on the roof insulating around an AC unit

In Al Jisr and need bathroom waterproofing?
Send us photos of the spot

Call us or send photos of the floor and wall bases on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp