Abraj Al AzlContracting
Call العربية
Bathroom floor and wall base brushed with a grey waterproof coat before tiling

Bathroom waterproofing in First Industrial Area

Sealed before the leak shows

Waterproofing bathroom and washroom floors, wall bases and drain openings, at the build stage or after tiling

+966 54 311 2066
The service in your area

Bathroom waterproofing in First Industrial Area

Bathroom waterproofing in the First Industrial Area begins with photos of floors, walls and openings, sent by call or WhatsApp. The area has warehouses and industrial and administrative buildings, and worker and office bathrooms need protection from damp and leaks.

Buildings in the First Industrial Area are of different ages and uses. Bathrooms in warehouses and factories face heavy use and may need robust waterproofing. Wash water and constant humidity can cause leaks in floors and walls if not properly sealed. Office bathrooms may show problems after years of use. Photos help us understand the building type and usage to choose the right waterproofing.

  • The First Industrial Area is a specialised zone in the Eastern Province, close to Al Lualu and Al Huwaylat, with industrial and commercial buildings.
  • A bathroom in an industrial building serves many users, placing greater demands on waterproofing to withstand constant humidity and use.
What the service includes

The main items of bathroom waterproofing in First Industrial Area

  • Treating washroom floors and wet surfaces with the material suited to each condition
  • Applying a continuous waterproof layer rising at walls and corners
  • Cleaning the surface and treating hairline cracks and pipe entries
  • Closing the drain opening ring and the bathroom door threshold
How we work

This is how we work in First Industrial Area

1

Send photos of the bathroom

On WhatsApp: photos of the floor, wall bases, the drain opening, pipe entries and any visible damp, so we can read the stage and choose the right treatment.

2

Inspect and choose the treatment

The surface is checked for the condition of the render, any cracks, pipe openings and the drain. From what is found, the waterproofing material and the stage are decided.

3

Prepare the surface and treat cracks

The surface is cleaned and dried, cracks are treated, pipe openings and the drain ring are closed, and the surface is left ready to take the waterproof layer.

4

Apply the layer and let it cure

The layer covers the floor, rises at the wall bases, the corners and the door threshold, and is left to cure fully before any finish goes over it.

What sets us apart

Why Abraj Al Azl?

Protects the rooms and ceiling belowA continuous layer stops water moving to the ceiling below the bathroom or to the wall of the room next to it.

Your request from First Industrial Area comes to usCall or WhatsApp on one number, and we answer you ourselves.

Start from First Industrial Area with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in First Industrial Area

Does waterproofing bathrooms in warehouses differ from office bathrooms in the First Industrial Area?

Yes, there is a significant difference. Warehouse bathrooms endure heavier use and may face external leaks. Office bathrooms may need lighter but precise waterproofing. Photos show the building type and the problem so we can choose the right solution.

Can a leak in a factory bathroom floor be treated without closing the building?

It depends on where the leak is and how serious it is. Some treatments can be done during operations, others may need limited downtime. Photos and a call help us determine the right timing and method for your business.

What is the difference between waterproofing before and after tiling?

Before tiling, the layer goes onto a clean open surface and covers everything fully, which is the best outcome. After tiling, the situation is assessed: if grout joints and cracks are the problem, treatment from above may work; if the original layer is absent or damaged, the tiles may need to come up. Photos help us decide which fits.

Why does damp appear on the ceiling of the room below the bathroom?

Water gets in through the drain opening, pipe entries or the corner between the floor and the wall, then travels horizontally inside the slab until it appears somewhere else. The stain on the ceiling can be far from the actual entry point. Photos from above and below help us trace the source.

What should I send you from First Industrial Area?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in First Industrial Area, and we will work out the next step with you.

How often should a bathroom be waterproofed in a building's life?

There is no fixed interval. The layer is affected by how well it was first applied, by movement in the building, by shocks to the tiles and by changes to the plumbing. The main signal is damp patches appearing or render crumbling at the wall base, not a date. At the first sign, send us a photo.

Nearby areas

Bathroom waterproofing near First Industrial Area

We also work near First Industrial Area, in Al Lualu (near Ghizlan), Al Huwaylat and Ash Shati (near Ghizlan).

Other services in the area

More services in First Industrial Area

Two workers on the roof insulating around an AC unit

Your first step in First Industrial Area:
a call or a WhatsApp message

Call us or send photos of the floor and wall bases on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp