
Waterproofing in King Faisal University
Waterproofing for roofs and buildings in King Faisal University begins with a photo sent via WhatsApp or call. The city has diverse academic and residential buildings, each potentially needing different protection from leaks and dampness.
King Faisal University city has newer and older buildings, including teaching and research facilities, student housing and staff quarters. Exposed roofs, tanks and building bathrooms can all face leaks. Newer buildings may need their waterproofing renewed after years, while older ones may show more obvious cracks or leaks. Dampness can appear in corridors and paved areas too, not just on roofs.
- King Faisal University is an academic and residential district in the Eastern Province, near Al Fanar, As Saif and An Nawras, with diverse buildings.
- Institutional buildings with heavy use often need regular monitoring for leaks and dampness to avoid structural damage.
What the service covers in King Faisal University
- Cleaning the surface and treating cracks, edges and AC bases
- Covering the waterproof layer with tiles or a protective coat to shield it from sun and wear
- Laying a continuous layer that turns up at the walls and closes at every opening
- Respecting the correct curing time for each material before the finish goes on
The stages of the work in King Faisal University
Send photos of the problem
On WhatsApp: photos of the roof, wall, tank or bathroom with any visible stain or crack, so we can read the surface and point to the right material family.
Prepare the surface
The surface is cleaned of dust, oil and any old coating, and cracks, joints, drain openings and AC bases are treated, because any point left untreated becomes a future entry point for water.
Apply the waterproof layer
The chosen material goes on according to the surface type, whether liquid, membrane rolls, cementitious coating or epoxy, and is turned up at the walls and closed at every opening, joint and edge.
Cure, then finish
The layer is left to cure according to its type, then tiles or a protective coating go over it to shield it from sun and wear, and each material has its own curing requirement which we follow.
Why Abraj Al Azl?
Treatment at the source, not the symptomPainting over the stain does not stop the water; treating the entry points is what stops it.
Start from King Faisal University with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
Your request from King Faisal University comes to usCall or WhatsApp on one number, and we answer you ourselves.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Before you book waterproofing in King Faisal University
Can an academic building's roof be waterproofed without disrupting indoor activities?
It depends on the roof location and the type of work needed. Photos will help us understand the layout and access, and we can then discuss options with you on how to coordinate work with the building's schedule.
Do shared bathrooms need more waterproofing than individual ones?
Yes, shared bathrooms experience heavier use and moisture exposure, so they may need stronger and more comprehensive waterproofing. Photos and information about user numbers and daily use help us assess the need.
When is epoxy the right choice and not the others?
Epoxy suits settings that stay wet or carry chemicals, such as pool basins, water tanks and wet-room floors. It cures hard and bonds to concrete, but it is not flexible, so it does not suit surfaces that expand and contract with heat or that face direct sun.
What decides the cost of waterproofing a building?
The total area of each location to be treated, the condition and depth of any damage, the material type each surface needs, the number of cracks and joints requiring prior treatment, and ease of access. Send photos of every location on WhatsApp and the scope of the work becomes clear.
What does full-building waterproofing cover in a single project?
Each location is treated with the material suited to it: the roof with its rolls or liquid coat, the tank with its cementitious or epoxy lining, the bathrooms and kitchens with a coat that closes the wall, the floor and the angles. We set out what is treated once we see photos of the whole building.
What should I send you from King Faisal University?
Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in King Faisal University, and we will work out the next step with you.
More services in King Faisal University


