Abraj Al AzlContracting
Call العربية
Worker rolling epoxy on a concrete floor in a wet area

Epoxy waterproofing in Ath Thuqbah

Epoxy bonds, it does not float

Epoxy waterproofing for tanks, pools, floors and wet rooms, with surface preparation, crack treatment and continuous resin layers

+966 54 311 2066
The service in your area

Epoxy waterproofing in Ath Thuqbah

Epoxy waterproofing in Ath Thuqbah starts with a photo of the area to be treated, sent by call or WhatsApp. The district is made up of houses and buildings close to South Al Khobar and the Thuqbah industrial area, and we apply resin to bathroom floors, small tanks and adjoining storerooms.

Ath Thuqbah has houses and residential buildings near industrial areas, so some floors face dust and heavy use as well as damp. These surfaces need thorough cleaning and preparation, including crack treatment before resin, and the layers can be built to suit the use. The photos reveal the kind of traffic each area is likely to carry before a system is chosen.

  • Ath Thuqbah is a district in Al Khobar in the Eastern Province, lying close to South Al Khobar and the Thuqbah industrial area.
  • Floors near industrial zones often need a thicker resin layer to withstand abrasion.
What the service includes

The epoxy waterproofing work in Ath Thuqbah

  • Applying epoxy layers with particular care at corners, joints and drain outlets
  • Treating hairline cracks and joints before the resin is applied
  • Leaving the layer to cure fully before the tank or pool is returned to use
  • Cleaning the surface, removing old coatings and roughening it
How we work

How we carry out epoxy waterproofing in Ath Thuqbah

1

Send photos of the surface

On WhatsApp: photos inside the tank, the pool or on the floor, showing the cracks, joints and anywhere the leak shows, so we can decide the right treatment.

2

Dry and prepare the surface

The tank or pool is emptied completely and the surface is left to dry, because epoxy does not bond to damp concrete. The surface is cleaned of dirt and old coatings, then roughened or treated to open the concrete pores.

3

Treat cracks and joints

Hairline cracks are opened slightly and cleaned, then filled with a suitable material before the resin goes on, because the layer alone does not bridge moving or wide cracks.

4

Apply the resin layers and let them cure

The two epoxy parts are mixed and successive layers are applied, each left to cure before the next, with particular care at corners, joints and drain outlets.

What sets us apart

Why Abraj Al Azl?

Bonded, not floatingEpoxy bonds into the concrete rather than sitting on top, which makes it hard for water pressure from inside to push it off.

Ath Thuqbah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Epoxy waterproofing in Ath ThuqbahWe choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about epoxy waterproofing in Ath Thuqbah

Can epoxy withstand heavy use in a storeroom attached to a Thuqbah building?

It depends on the layer thickness and the type of traffic. The photos make suitability clear, and we will tell you if the floor needs a stronger system.

What should I send to start waterproofing a basin in Ath Thuqbah?

Send photos of the basin and its surrounding walls, and say whether it holds water continuously. After reviewing them we will set out the right steps for that basin.

Why must the surface be completely dry before epoxy is applied?

Epoxy is a chemical resin that needs to react with the concrete, not with water. Moisture in the concrete prevents full adhesion and can cause the layer to blister or separate later. That is why tanks are emptied and the surface is left to dry before work begins.

Is Ath Thuqbah within your service area?

Yes, Ath Thuqbah is one of the areas we work in, as are Al Khubar Al Janubiyah, Sinaiyah Ath Thuqbah and Al Iskan (near Al Khobar). To start, call us or message us on WhatsApp.

How do I know if an old epoxy layer needs renewing?

Signs that renewal is due include blisters or bubbles on the surface, sections that have separated or are lifting, leaks returning through the layer, and unusual discolouration or roughness. If you notice any of these, send photos on WhatsApp and we will assess the condition.

What is the difference between epoxy and a cementitious coating for tank waterproofing?

A cementitious coating is relatively flexible, suits most tanks and tolerates some surface moisture during application. Epoxy bonds harder and resists chemicals better, but needs a fully dry surface. The choice between the two depends on the condition of the tank and what it holds. Send photos and we will advise.

Nearby areas

We also offer it in neighbouring areas

Nearby areas we also cover: Al Khubar Al Janubiyah, Sinaiyah Ath Thuqbah and Al Iskan (near Al Khobar).

Other services in the area

More services in Ath Thuqbah

Worker rolling the white insulation layer onto a roof

Your first step in Ath Thuqbah:
a call or a WhatsApp message

Describe the problem and where it is in Ath Thuqbah, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp