Abraj Al AzlContracting
Call العربية
Worker rolling epoxy on a concrete floor in a wet area

Epoxy waterproofing in At Tuhaymiyah

Epoxy bonds, it does not float

Epoxy waterproofing for tanks, pools, floors and wet rooms, with surface preparation, crack treatment and continuous resin layers

+966 54 311 2066
The service in your area

Epoxy waterproofing in At Tuhaymiyah

Epoxy waterproofing for pools, tanks and floors in At Tuhaymiyah starts with photos of the surface and cracks sent by call or WhatsApp. The hamlet has scattered houses and villas on wide plots, where tank and pool surfaces need protection from heat and moisture.

Houses and villas in At Tuhaymiyah sit on spacious plots, often with their own tank or pool. These tanks face direct sun all day and develop cracks from thermal expansion and contraction. Floors in bathrooms, kitchens and yards also need waterproofing that withstands water and moisture. Photos help identify where the damage is and which epoxy method suits best.

  • At Tuhaymiyah is a hamlet in the Eastern Province, close to Al Uthmaniyah and Udhailiyah.
  • A pool or tank in direct sun heats rapidly, so epoxy there must withstand high temperatures.
What the service includes

What the service covers in At Tuhaymiyah

  • Leaving the layer to cure fully before the tank or pool is returned to use
  • Inspecting the internal surface and locating leak points and cracks
  • Treating hairline cracks and joints before the resin is applied
  • Cleaning the surface, removing old coatings and roughening it
How we work

This is how we work in At Tuhaymiyah

1

Send photos of the surface

On WhatsApp: photos inside the tank, the pool or on the floor, showing the cracks, joints and anywhere the leak shows, so we can decide the right treatment.

2

Dry and prepare the surface

The tank or pool is emptied completely and the surface is left to dry, because epoxy does not bond to damp concrete. The surface is cleaned of dirt and old coatings, then roughened or treated to open the concrete pores.

3

Treat cracks and joints

Hairline cracks are opened slightly and cleaned, then filled with a suitable material before the resin goes on, because the layer alone does not bridge moving or wide cracks.

4

Apply the resin layers and let them cure

The two epoxy parts are mixed and successive layers are applied, each left to cure before the next, with particular care at corners, joints and drain outlets.

What sets us apart

Why Abraj Al Azl?

A hard surface that resists standing waterOnce cured, the resin is hard and resists standing water and cleaning agents, making it suitable for tanks, basins and wet floors.

At Tuhaymiyah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Epoxy waterproofing in At TuhaymiyahWe choose the method and the materials once we know the condition of the spot.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in At Tuhaymiyah

Can an old bathroom floor in At Tuhaymiyah be epoxy-coated?

Yes, but it depends on the concrete and tile condition. The floor must be sound with no voids beneath it. Photos show whether it is ready for epoxy or needs repair first.

How does epoxy prevent cracks in a villa tank?

Epoxy fills existing cracks and forms a flexible layer that tolerates thermal expansion and contraction. Large or deep cracks are treated first before epoxy application to ensure lasting waterproofing.

Is epoxy safe for drinking-water tanks?

There are epoxy grades rated for drinking-water contact. When applied in drinking-water tanks, the layer must cure fully before the tank is refilled. Send photos and tell us whether the tank is for drinking or service water, so we can choose the right material.

What is the difference between epoxy and a cementitious coating for tank waterproofing?

A cementitious coating is relatively flexible, suits most tanks and tolerates some surface moisture during application. Epoxy bonds harder and resists chemicals better, but needs a fully dry surface. The choice between the two depends on the condition of the tank and what it holds. Send photos and we will advise.

Why must the surface be completely dry before epoxy is applied?

Epoxy is a chemical resin that needs to react with the concrete, not with water. Moisture in the concrete prevents full adhesion and can cause the layer to blister or separate later. That is why tanks are emptied and the surface is left to dry before work begins.

How do I request epoxy waterproofing in At Tuhaymiyah?

Call us, or send clear photos of the spot and its location in At Tuhaymiyah on WhatsApp, and we will work out the next step with you.

Nearby areas

The same service in nearby areas

If the site is outside At Tuhaymiyah, the same service is available in Al Uthmaniyah, Udhailiyah and Imam Muhammed Ibn Saud Islamic University District.

Other services in the area

More services in At Tuhaymiyah

Worker rolling the white insulation layer onto a roof

Epoxy waterproofing in At Tuhaymiyah?
Call us now

Call us or send photos of the surface on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp