Abraj Al AzlContracting
Call العربية
Worker rolling epoxy on a concrete floor in a wet area

Epoxy waterproofing in Al Madaris

Epoxy bonds, it does not float

Epoxy waterproofing for tanks, pools, floors and wet rooms, with surface preparation, crack treatment and continuous resin layers

+966 54 311 2066
The service in your area

Epoxy waterproofing in Al Madaris

Epoxy waterproofing in Al Madaris protects water tanks, pools and damp surfaces in residential and small buildings. Send a photo of the surface or tank by WhatsApp or call, and we start the assessment from there.

This district has small houses, villas and occasionally older small buildings, facing high humidity and heat. Roof tanks are exposed to hot sun, and damp floors and walls need protection from leaks. Epoxy suits smooth and slightly cracked surfaces, but needs good preparation. Older houses may have surfaces that are hard to dry, and photos show this so we choose the right method.

  • Al Madaris is a residential district in the Eastern Province, near Ad Doij, Al Madani and Mayyas.
  • Tanks in small residential areas are usually old, and epoxy needs a clean, dry surface before application.
What the service includes

The epoxy waterproofing work in Al Madaris

  • Applying epoxy layers with particular care at corners, joints and drain outlets
  • Treating hairline cracks and joints before the resin is applied
  • Emptying the tank or pool and waiting for the surface to dry fully
  • Leaving the layer to cure fully before the tank or pool is returned to use
How we work

From first contact to the finished job in Al Madaris

1

Send photos of the surface

On WhatsApp: photos inside the tank, the pool or on the floor, showing the cracks, joints and anywhere the leak shows, so we can decide the right treatment.

2

Dry and prepare the surface

The tank or pool is emptied completely and the surface is left to dry, because epoxy does not bond to damp concrete. The surface is cleaned of dirt and old coatings, then roughened or treated to open the concrete pores.

3

Treat cracks and joints

Hairline cracks are opened slightly and cleaned, then filled with a suitable material before the resin goes on, because the layer alone does not bridge moving or wide cracks.

4

Apply the resin layers and let them cure

The two epoxy parts are mixed and successive layers are applied, each left to cure before the next, with particular care at corners, joints and drain outlets.

What sets us apart

Why Abraj Al Azl?

Bonded, not floatingEpoxy bonds into the concrete rather than sitting on top, which makes it hard for water pressure from inside to push it off.

Start from Al Madaris with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Your request from Al Madaris comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about epoxy waterproofing in Al Madaris

Is epoxy suitable for an old tank in Al Madaris?

Yes, if the concrete is sound. Photos show whether the surface is cracked or leaking, so we repair cracks first then apply epoxy. If the structure is badly damaged, photos will show it and we will advise the best solution.

Do damp floors in old houses need drying before epoxy?

Yes, moisture under the surface can weaken epoxy. Photos and examination show humidity levels, and we may need to air or dry before application to ensure epoxy adheres well.

How do I request epoxy waterproofing in Al Madaris?

Call us, or send clear photos of the spot and its location in Al Madaris on WhatsApp, and we will work out the next step with you.

What decides the cost of epoxy waterproofing?

The area to be treated, its condition in terms of cracks, dirt and old coatings, how easily the site can be reached, and whether cracks need work before the resin goes on. Send photos with rough dimensions on WhatsApp and we will explain what the treatment covers.

Is epoxy suitable for waterproofing external roof surfaces?

Epoxy is mainly suited to internal surfaces. Outdoors the layer is exposed to ultraviolet light, which causes yellowing and gradual loss of its properties. On open external surfaces, other materials such as bitumen or liquid membranes are usually more suitable. Photos help us advise which is right for your surface.

What is the difference between epoxy and a cementitious coating for tank waterproofing?

A cementitious coating is relatively flexible, suits most tanks and tolerates some surface moisture during application. Epoxy bonds harder and resists chemicals better, but needs a fully dry surface. The choice between the two depends on the condition of the tank and what it holds. Send photos and we will advise.

Nearby areas

We also offer it in neighbouring areas

Nearby areas we also cover: Ad Doij, Al Madani and Mayyas.

Other services in the area

More services in Al Madaris

Worker rolling the white insulation layer onto a roof

Epoxy waterproofing in Al Madaris?
Call us now

Describe the problem and where it is in Al Madaris, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp