Abraj Al AzlContracting
Call العربية
Worker rolling epoxy on a concrete floor in a wet area

Epoxy waterproofing in Al Hamra (near Dammam)

Epoxy bonds, it does not float

Epoxy waterproofing for tanks, pools, floors and wet rooms, with surface preparation, crack treatment and continuous resin layers

+966 54 311 2066
The service in your area

Epoxy waterproofing in Al Hamra (near Dammam)

Epoxy waterproofing in Al Hamra starts with photos of the tank, floor or bathroom, sent by call or WhatsApp. The district lies between Az Zuhur, Al Jawharah and As Salam and mixes villas with residential buildings, so the surfaces vary with each structure.

Al Hamra contains villas and residential buildings with varied surfaces, from bathrooms and kitchens to roof tanks. Each surface needs different preparation, since a new concrete floor differs from an old cracked one. The photos determine what cleaning, levelling and crack treatment is needed before the continuous resin layers go on.

  • Al Hamra is a residential district in the Eastern Province between Az Zuhur, Al Jawharah and As Salam, combining villas and residential buildings.
  • Older concrete floors often need levelling before coating, otherwise voids show through the layer.
What the service includes

What the service covers in Al Hamra (near Dammam)

  • Treating hairline cracks and joints before the resin is applied
  • Applying epoxy layers with particular care at corners, joints and drain outlets
  • Inspecting the internal surface and locating leak points and cracks
  • Emptying the tank or pool and waiting for the surface to dry fully
How we work

This is how we work in Al Hamra (near Dammam)

1

Send photos of the surface

On WhatsApp: photos inside the tank, the pool or on the floor, showing the cracks, joints and anywhere the leak shows, so we can decide the right treatment.

2

Dry and prepare the surface

The tank or pool is emptied completely and the surface is left to dry, because epoxy does not bond to damp concrete. The surface is cleaned of dirt and old coatings, then roughened or treated to open the concrete pores.

3

Treat cracks and joints

Hairline cracks are opened slightly and cleaned, then filled with a suitable material before the resin goes on, because the layer alone does not bridge moving or wide cracks.

4

Apply the resin layers and let them cure

The two epoxy parts are mixed and successive layers are applied, each left to cure before the next, with particular care at corners, joints and drain outlets.

What sets us apart

Why Abraj Al Azl?

A hard surface that resists standing waterOnce cured, the resin is hard and resists standing water and cleaning agents, making it suitable for tanks, basins and wet floors.

Your request from Al Hamra (near Dammam) comes to usCall or WhatsApp on one number, and we answer you ourselves.

We serve Al Hamra (near Dammam) and around itIncluding Az Zuhur (near Dammam), Al Jawharah (near Sayhat) and As Salam (near Dammam), as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Hamra (near Dammam)

Does an old concrete floor in Al Hamra need levelling before epoxy?

Often yes if there are voids or unevenness, since these show through the resin later. The photos show how much levelling is needed.

Is epoxy suitable for a roof tank on villas in Al Hamra?

Often yes, if the concrete tank is sound and its surface is open enough to bond. The photos let us judge this, and if we find a structural fault we will tell you.

Why must the surface be completely dry before epoxy is applied?

Epoxy is a chemical resin that needs to react with the concrete, not with water. Moisture in the concrete prevents full adhesion and can cause the layer to blister or separate later. That is why tanks are emptied and the surface is left to dry before work begins.

What decides the cost of epoxy waterproofing?

The area to be treated, its condition in terms of cracks, dirt and old coatings, how easily the site can be reached, and whether cracks need work before the resin goes on. Send photos with rough dimensions on WhatsApp and we will explain what the treatment covers.

How do I request epoxy waterproofing in Al Hamra (near Dammam)?

Call us, or send clear photos of the spot and its location in Al Hamra (near Dammam) on WhatsApp, and we will work out the next step with you.

How do I know if an old epoxy layer needs renewing?

Signs that renewal is due include blisters or bubbles on the surface, sections that have separated or are lifting, leaks returning through the layer, and unusual discolouration or roughness. If you notice any of these, send photos on WhatsApp and we will assess the condition.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: Az Zuhur (near Dammam), Al Jawharah (near Sayhat) and As Salam (near Dammam).

Other services in the area

More services in Al Hamra (near Dammam)

Worker rolling the white insulation layer onto a roof

We start with you in Al Hamra (near Dammam)
with one call

Describe the problem and where it is in Al Hamra (near Dammam), and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp