Abraj Al AzlContracting
Call العربية
Worker rolling epoxy on a concrete floor in a wet area

Epoxy waterproofing in Al Anwar (near Dammam)

Epoxy bonds, it does not float

Epoxy waterproofing for tanks, pools, floors and wet rooms, with surface preparation, crack treatment and continuous resin layers

+966 54 311 2066
The service in your area

Epoxy waterproofing in Al Anwar (near Dammam)

Epoxy waterproofing in Al Anwar starts with a photo of the pool, tank or floor, sent by call or WhatsApp. The district features villas and relatively new buildings, where freshly cast surfaces need careful preparation before the layers go on.

Al Anwar has detached villas and newer buildings, and private pools are fairly common. Freshly poured concrete needs enough time to dry before epoxy goes on, or adhesion suffers. In pools the interior lining and the coping edge are checked closely. The photos show what needs repair before work begins rather than assuming the base is sound.

  • Al Anwar is a district of Dhahran in the Eastern Province, beside Al Amal and Al Urubah.
  • New concrete needs adequate drying time, because trapped moisture stops the resin bonding.
What the service includes

The main items of epoxy waterproofing in Al Anwar (near Dammam)

  • Emptying the tank or pool and waiting for the surface to dry fully
  • Inspecting the internal surface and locating leak points and cracks
  • Cleaning the surface, removing old coatings and roughening it
  • Applying epoxy layers with particular care at corners, joints and drain outlets
How we work

From first contact to the finished job in Al Anwar (near Dammam)

1

Send photos of the surface

On WhatsApp: photos inside the tank, the pool or on the floor, showing the cracks, joints and anywhere the leak shows, so we can decide the right treatment.

2

Dry and prepare the surface

The tank or pool is emptied completely and the surface is left to dry, because epoxy does not bond to damp concrete. The surface is cleaned of dirt and old coatings, then roughened or treated to open the concrete pores.

3

Treat cracks and joints

Hairline cracks are opened slightly and cleaned, then filled with a suitable material before the resin goes on, because the layer alone does not bridge moving or wide cracks.

4

Apply the resin layers and let them cure

The two epoxy parts are mixed and successive layers are applied, each left to cure before the next, with particular care at corners, joints and drain outlets.

What sets us apart

Why Abraj Al Azl?

Bonded, not floatingEpoxy bonds into the concrete rather than sitting on top, which makes it hard for water pressure from inside to push it off.

Al Anwar (near Dammam) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We serve Al Anwar (near Dammam) and around itIncluding Al Amal (near Dhahran), Al Urubah (near Dhahran) and Al Manar (near Dammam), as part of our work across the Eastern Province.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on epoxy waterproofing in Al Anwar (near Dammam)

When can epoxy go on a newly poured floor in Al Anwar?

It depends on the moisture left in the concrete rather than on days alone. We judge what we can from the photos and description and tell you whether the surface is ready.

Do you treat a leaking private pool in Al Anwar?

Yes, we serve Al Anwar. Send photos of the pool, its edge and any damp patches around it, and we will tell you from those whether epoxy suits it.

Do you cover Al Anwar (near Dammam)?

Yes. We serve Al Anwar (near Dammam) and nearby areas such as Al Amal (near Dhahran), Al Urubah (near Dhahran) and Al Manar (near Dammam), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Why must the surface be completely dry before epoxy is applied?

Epoxy is a chemical resin that needs to react with the concrete, not with water. Moisture in the concrete prevents full adhesion and can cause the layer to blister or separate later. That is why tanks are emptied and the surface is left to dry before work begins.

What decides the cost of epoxy waterproofing?

The area to be treated, its condition in terms of cracks, dirt and old coatings, how easily the site can be reached, and whether cracks need work before the resin goes on. Send photos with rough dimensions on WhatsApp and we will explain what the treatment covers.

How do I know if an old epoxy layer needs renewing?

Signs that renewal is due include blisters or bubbles on the surface, sections that have separated or are lifting, leaks returning through the layer, and unusual discolouration or roughness. If you notice any of these, send photos on WhatsApp and we will assess the condition.

Nearby areas

We also offer it in neighbouring areas

We also work near Al Anwar (near Dammam), in Al Amal (near Dhahran), Al Urubah (near Dhahran) and Al Manar (near Dammam).

Other services in the area

More services in Al Anwar (near Dammam)

Worker rolling the white insulation layer onto a roof

We start with you in Al Anwar (near Dammam)
with one call

Call us or send photos of the surface on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp