Abraj Al AzlContracting
Call العربية
Villa roof finished in white insulation with a glass railing over the sea

Waterproofing in Al Hijaz

Start at the source

Waterproofing for roofs, tanks, pools, bathrooms and foundations

+966 54 311 2066
The service in your area

Waterproofing in Al Hijaz

Waterproofing roofs, tanks and bathrooms in Al Hijaz begins with a call or photo sent via WhatsApp. The district has diverse homes and shops, whose roofs and tanks need protection against intense heat and seasonal damp.

Al Hijaz has buildings varying in age and size, from older homes to modern shops, each needing different repair. Flat roofs common here crack from the temperature swing between day and night, and roof-mounted tanks leak around pipes and joints. Bathrooms and kitchens harbour damp, with wet patches visible inside and out. Photos help us assess each case and pick the right method for the site.

  • Al Hijaz is a district in the Eastern Province, near Makkah, Al Fanatir and Darin, with diverse homes and shops.
  • Flat roofs in residential and commercial areas face large temperature swings, so they need flexible and durable waterproofing materials.
What the service includes

What we do for you in Al Hijaz

  • Respecting the correct curing time for each material before the finish goes on
  • Checking the surface and finding the entry points: cracks, joints and openings
  • Cleaning the surface and treating cracks, edges and AC bases
  • Choosing the right material for each location from cementitious coat, bitumen rolls, liquid membrane and epoxy
How we work

From first contact to the finished job in Al Hijaz

1

Send photos of the problem

On WhatsApp: photos of the roof, wall, tank or bathroom with any visible stain or crack, so we can read the surface and point to the right material family.

2

Prepare the surface

The surface is cleaned of dust, oil and any old coating, and cracks, joints, drain openings and AC bases are treated, because any point left untreated becomes a future entry point for water.

3

Apply the waterproof layer

The chosen material goes on according to the surface type, whether liquid, membrane rolls, cementitious coating or epoxy, and is turned up at the walls and closed at every opening, joint and edge.

4

Cure, then finish

The layer is left to cure according to its type, then tiles or a protective coating go over it to shield it from sun and wear, and each material has its own curing requirement which we follow.

What sets us apart

Why Abraj Al Azl?

Treatment at the source, not the symptomPainting over the stain does not stop the water; treating the entry points is what stops it.

Your request from Al Hijaz comes to usCall or WhatsApp on one number, and we answer you ourselves.

Start from Al Hijaz with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on waterproofing in Al Hijaz

Why do water tanks leak in Al Hijaz?

Leaks usually occur at joints, pipes and around inspection openings, and intense heat speeds the breakdown of the lining. Send a photo of the tank and tell us about any wet patches to identify the leak source.

Can an old roof in Al Hijaz be waterproofed without stripping the whole old layer?

It depends on the old layer's condition and existing cracks. Photos show whether we can build on it or must remove parts; we will tell you what suits your case.

What does full-building waterproofing cover in a single project?

Each location is treated with the material suited to it: the roof with its rolls or liquid coat, the tank with its cementitious or epoxy lining, the bathrooms and kitchens with a coat that closes the wall, the floor and the angles. We set out what is treated once we see photos of the whole building.

What decides the cost of waterproofing a building?

The total area of each location to be treated, the condition and depth of any damage, the material type each surface needs, the number of cracks and joints requiring prior treatment, and ease of access. Send photos of every location on WhatsApp and the scope of the work becomes clear.

When is epoxy the right choice and not the others?

Epoxy suits settings that stay wet or carry chemicals, such as pool basins, water tanks and wet-room floors. It cures hard and bonds to concrete, but it is not flexible, so it does not suit surfaces that expand and contract with heat or that face direct sun.

How do I request waterproofing in Al Hijaz?

Call us, or send clear photos of the spot and its location in Al Hijaz on WhatsApp, and we will work out the next step with you.

Nearby areas

The same service in nearby areas

If the site is outside Al Hijaz, the same service is available in Makkah, Al Fanatir and Darin (near Al Fadili).

Other services in the area

More services in Al Hijaz

Two workers on the roof insulating around an AC unit

Waterproofing in Al Hijaz?
Call us now

Describe the problem and where it is in Al Hijaz, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp