Abraj Al AzlContracting
Call العربية
White stepped dome on an insulated roof above a street

Tiled roof waterproofing in Al Husayy

The leak hides under the tiles

Waterproofing for tiled roofs, covering tile joints, the layer beneath and all surrounding points

+966 54 311 2066
The service in your area

Tiled roof waterproofing in Al Husayy

Tiled roof waterproofing in Al Husayy begins with photos of the roof and its edges, sent by call or WhatsApp. Al Husayy is a small village close to Utayyiq, Ghanwa and Nita, and most of its houses are detached with pitched tiled roofs.

Al Husayy is made up of detached houses on plots of varying size, so each tiled roof reflects its own age and construction. Dust and leaves gather between tiles, holding moisture and weakening the joints over time. Some roofs may need only their edges treated, while others need a full protective layer, and the photos show which case applies.

  • Al Husayy is a village in the Al-Ahsa governorate of the Eastern Province, close to Utayyiq, Ghanwa and Nita.
  • Tiling covered in dust holds moisture longer than clean tiling does.
What the service includes

The scope of the work in Al Husayy

  • Applying the waterproof layer over the tiles or on the slab after lifting, depending on the condition
  • Relaying the tiles or adding the protective layer once the waterproofing has cured
  • Sealing around tank and AC bases and all drain openings
  • Treating hairline cracks and open joints
How we work

This is how we work in Al Husayy

1

Send photos of the roof

On WhatsApp: photos of the joints, any loose tiles, the parapet, the tank and AC bases and any stains on the ceiling inside, so we can judge whether to waterproof over the tiles or lift them.

2

Inspect and clean

The roof is inspected carefully, the joints and cracks are cleaned of dust and debris, and any point that needs spot treatment is marked before the waterproof layer goes on.

3

Treat cracks and critical points

Hairline cracks and open joints are treated, and the points around tank and AC bases, drain openings and the parapet edge are sealed before the general layer is applied.

4

Apply the layer and the protection

The waterproof layer that suits the surface condition is applied, either over the tiles or on the concrete slab after the tiles are lifted, then left to cure before any finish is replaced.

What sets us apart

Why Abraj Al Azl?

The leak is treated at its sourceThe treatment reaches the joints and the slab itself, not just the interior symptoms, to cut the water's path inside the concrete.

Tiled roof waterproofing in Al HusayyWe choose the method and the materials once we know the condition of the spot.

Your request from Al Husayy comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about tiled roof waterproofing in Al Husayy

Does tiling need cleaning before roof waterproofing in Al Husayy?

Yes, dust and leaves between tiles stop the protective layer from bonding. The roof is cleaned before treatment, and the photos show how much build-up there is before we start.

Do you treat detached roofs in Al Husayy?

Yes, we serve Al Husayy and its detached houses. Send photos of the roof and the edges around it, and we will decide with you whether the treatment is spot or full.

What is different about waterproofing a tiled roof compared with a bare concrete roof?

A bare concrete roof is cleaned and the layer goes straight on. A tiled roof adds an extra assessment step: keep the tiles or lift them. The joints are also treated with materials that suit the expansion and contraction from heat, which matters considerably.

Can the work be done in the summer heat?

Yes, though the heat affects how long some materials take to cure and can speed the drying of wet-applied coatings. The waterproofing material is chosen with the expected temperature in mind and the method of application adjusted accordingly. Send photos at any time of year and we will advise what suits the conditions.

What decides the cost of waterproofing a tiled roof?

The roof area, the condition of the tiles and the joints, the number of cracks and critical points such as tank and AC bases, whether the tiles need lifting, and how easily the roof can be reached. Send photos and rough dimensions on WhatsApp and we will advise the right treatment.

Do you cover Al Husayy?

Yes. We serve Al Husayy and nearby areas such as Utayyiq, Ghanwa and Nita, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Nearby areas

Areas near Al Husayy

If the site is outside Al Husayy, the same service is available in Utayyiq, Ghanwa and Nita.

Other services in the area

More services in Al Husayy

White insulated dome on a roof among the houses

We start with you in Al Husayy
with one call

Describe the problem and where it is in Al Husayy, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp