Abraj Al AzlContracting
Call العربية
White stepped dome on an insulated roof above a street

Tiled roof waterproofing in Al Hayra

The leak hides under the tiles

Waterproofing for tiled roofs, covering tile joints, the layer beneath and all surrounding points

+966 54 311 2066
The service in your area

Tiled roof waterproofing in Al Hayra

Tiled roof waterproofing in Al Hayra starts with a photo of the roof and the tile condition, sent by call or WhatsApp. Small villages have houses and villas with tiled roofs exposed to intense heat and humidity, and leaks often show around the gaps between and beneath the tiles.

Al Hayra contains both traditional houses and modern villas, both needing protection for their tiled roofs against leaks. Tiles shift slightly as heat changes, widening the gaps between them so water reaches the base layer. Humidity in the air and cold dew at night add pressure to cavities and joints, and damp appears on indoor ceilings. The photos show where the leak is, the tile type and the base layer before any protection method is chosen.

  • Al Hayra is a village in the Eastern Province, close to Ibn Sharar and Al Lisafah, with houses and villas that have tiled roofs.
  • Roof tiles need constant water protection because harsh heat makes the joints between them weaker.
What the service includes

What the service covers in Al Hayra

  • Sealing around tank and AC bases and all drain openings
  • Treating hairline cracks and open joints
  • Cleaning the surface and clearing debris from the joints
  • Inspecting the tiles, the joints and all critical roof points
How we work

From first contact to the finished job in Al Hayra

1

Send photos of the roof

On WhatsApp: photos of the joints, any loose tiles, the parapet, the tank and AC bases and any stains on the ceiling inside, so we can judge whether to waterproof over the tiles or lift them.

2

Inspect and clean

The roof is inspected carefully, the joints and cracks are cleaned of dust and debris, and any point that needs spot treatment is marked before the waterproof layer goes on.

3

Treat cracks and critical points

Hairline cracks and open joints are treated, and the points around tank and AC bases, drain openings and the parapet edge are sealed before the general layer is applied.

4

Apply the layer and the protection

The waterproof layer that suits the surface condition is applied, either over the tiles or on the concrete slab after the tiles are lifted, then left to cure before any finish is replaced.

What sets us apart

Why Abraj Al Azl?

The reinforcement is protectedStopping the water before it reaches the steel protects the slab and limits costs that grow the longer the treatment waits.

We serve Al Hayra and around itIncluding Ibn Sharar, Al Lisafah and Manakh, as part of our work across the Eastern Province.

Al Hayra is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about tiled roof waterproofing in Al Hayra

Does damp on my indoor ceiling mean the tiled roof is leaking?

Usually yes, but water can come from elsewhere. Send photos of the roof outside and the ceiling inside so we can find the real source and advise you.

Can an old tiled roof in Al Hayra be waterproofed without removing the tiles?

It depends on the condition of the tiles, joints and base layer. If they are sound we treat the gaps and add protection from above; if the base is damaged it may need removal. The photos decide.

Why does the stain appear far from where the water entered?

Water enters through the joints or a critical point then travels horizontally inside the concrete or between layers until it finds somewhere to come through, so the stain appears below a completely different point. That is why a tiled roof needs a thorough inspection, not just of the area above the stain.

Is Al Hayra within your service area?

Yes, Al Hayra is one of the areas we work in, as are Ibn Sharar, Al Lisafah and Manakh. To start, call us or message us on WhatsApp.

Does waterproofing over the tiles change how the roof looks?

It depends on the layer used. Some layers are nearly clear and keep the tile colour, others give a uniform finish. We decide the layer type from the surface condition and what it needs. The overall look usually does not change in a way that stands out.

What is different about waterproofing a tiled roof compared with a bare concrete roof?

A bare concrete roof is cleaned and the layer goes straight on. A tiled roof adds an extra assessment step: keep the tiles or lift them. The joints are also treated with materials that suit the expansion and contraction from heat, which matters considerably.

Nearby areas

We also offer it in neighbouring areas

If the site is outside Al Hayra, the same service is available in Ibn Sharar, Al Lisafah and Manakh.

Other services in the area

More services in Al Hayra

White insulated dome on a roof among the houses

Your first step in Al Hayra:
a call or a WhatsApp message

Describe the problem and where it is in Al Hayra, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp