Abraj Al AzlContracting
Call العربية
White stepped dome on an insulated roof above a street

Tiled roof waterproofing in Al Fadili

The leak hides under the tiles

Waterproofing for tiled roofs, covering tile joints, the layer beneath and all surrounding points

+966 54 311 2066
The service in your area

Tiled roof waterproofing in Al Fadili

Tiled roof waterproofing in Al Fadili starts with photos of the roof, tile condition, joints and edges sent via WhatsApp or call. The village has houses, villas and small buildings, with tiled roofs prone to cracking and leaks from heat and damp.

Al Fadili is a small village of houses, villas and some small commercial buildings spread over a moderate area. Tiled roofs here face harsh summer heat and rapid temperature swings. Tiles, joints and concrete expand and contract, creating fine cracks that let water through during rare but heavy rain. Edges, corners and areas around openings are the first places problems appear. Photos show precisely where waterproofing is needed.

  • Al Fadili is a village in the Eastern Province near Al Fasl, the Third Industrial Area and Al Matrafiyah, with houses, villas and small buildings.
  • Rare rain in the Eastern Province can be heavy and sudden, putting stress on the narrow joints of tiled roofs.
What the service includes

What the service covers in Al Fadili

  • Relaying the tiles or adding the protective layer once the waterproofing has cured
  • Sealing around tank and AC bases and all drain openings
  • Cleaning the surface and clearing debris from the joints
  • Inspecting the tiles, the joints and all critical roof points
How we work

From first contact to the finished job in Al Fadili

1

Send photos of the roof

On WhatsApp: photos of the joints, any loose tiles, the parapet, the tank and AC bases and any stains on the ceiling inside, so we can judge whether to waterproof over the tiles or lift them.

2

Inspect and clean

The roof is inspected carefully, the joints and cracks are cleaned of dust and debris, and any point that needs spot treatment is marked before the waterproof layer goes on.

3

Treat cracks and critical points

Hairline cracks and open joints are treated, and the points around tank and AC bases, drain openings and the parapet edge are sealed before the general layer is applied.

4

Apply the layer and the protection

The waterproof layer that suits the surface condition is applied, either over the tiles or on the concrete slab after the tiles are lifted, then left to cure before any finish is replaced.

What sets us apart

Why Abraj Al Azl?

The reinforcement is protectedStopping the water before it reaches the steel protects the slab and limits costs that grow the longer the treatment waits.

Al Fadili is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We serve Al Fadili and around itIncluding Al Fasl, Third Industrial Area and Al Matrafiyah, as part of our work across the Eastern Province.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book tiled roof waterproofing in Al Fadili

Does cracked tile mean the whole roof must be rebuilt?

No. If only a few tiles are cracked we may treat just those tiles and the joints around them. Photos show whether the problem is local or affects a larger area.

Is treating the joints alone enough to stop a leak from an old tiled roof?

Often yes, if the tiles and the layer below are sound. But if the tiles themselves or the layer below are damaged we may need extra steps. Photos determine what is enough.

Can the work be done in the summer heat?

Yes, though the heat affects how long some materials take to cure and can speed the drying of wet-applied coatings. The waterproofing material is chosen with the expected temperature in mind and the method of application adjusted accordingly. Send photos at any time of year and we will advise what suits the conditions.

What is different about waterproofing a tiled roof compared with a bare concrete roof?

A bare concrete roof is cleaned and the layer goes straight on. A tiled roof adds an extra assessment step: keep the tiles or lift them. The joints are also treated with materials that suit the expansion and contraction from heat, which matters considerably.

Is Al Fadili within your service area?

Yes, Al Fadili is one of the areas we work in, as are Al Fasl, Third Industrial Area and Al Matrafiyah. To start, call us or message us on WhatsApp.

What decides the cost of waterproofing a tiled roof?

The roof area, the condition of the tiles and the joints, the number of cracks and critical points such as tank and AC bases, whether the tiles need lifting, and how easily the roof can be reached. Send photos and rough dimensions on WhatsApp and we will advise the right treatment.

Nearby areas

Areas near Al Fadili

We also work near Al Fadili, in Al Fasl, Third Industrial Area and Al Matrafiyah.

Other services in the area

More services in Al Fadili

White insulated dome on a roof among the houses

Tell us about your site in Al Fadili
and we will plan the next step with you

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp