Abraj Al AzlContracting
Call العربية
White stepped dome on an insulated roof above a street

Tiled roof waterproofing in Al Boweibiya

The leak hides under the tiles

Waterproofing for tiled roofs, covering tile joints, the layer beneath and all surrounding points

+966 54 311 2066
The service in your area

Tiled roof waterproofing in Al Boweibiya

Tiled roof waterproofing in Al Boweibiya starts with photos of the roof sent by call or WhatsApp. The village has an old town centre and newer quarters, each with roofs tiled in different ways.

In the old centre of Al Boweibiya roofs are older and often carry tile layers added over time. In the newer quarters roofs are more regular, and the problem there is usually at the junctions between sections. The photos show which case applies to your roof before a method is chosen.

  • Al Boweibiya is a village in the Eastern Province, close to Ar Rafiah, Al Andalus and its old town centre.
  • Layers of tiles added over time on older roofs can trap moisture if the area beneath is not checked.
What the service includes

The tiled roof waterproofing work in Al Boweibiya

  • Cleaning the surface and clearing debris from the joints
  • Applying the waterproof layer over the tiles or on the slab after lifting, depending on the condition
  • Relaying the tiles or adding the protective layer once the waterproofing has cured
  • Treating hairline cracks and open joints
How we work

This is how we work in Al Boweibiya

1

Send photos of the roof

On WhatsApp: photos of the joints, any loose tiles, the parapet, the tank and AC bases and any stains on the ceiling inside, so we can judge whether to waterproof over the tiles or lift them.

2

Inspect and clean

The roof is inspected carefully, the joints and cracks are cleaned of dust and debris, and any point that needs spot treatment is marked before the waterproof layer goes on.

3

Treat cracks and critical points

Hairline cracks and open joints are treated, and the points around tank and AC bases, drain openings and the parapet edge are sealed before the general layer is applied.

4

Apply the layer and the protection

The waterproof layer that suits the surface condition is applied, either over the tiles or on the concrete slab after the tiles are lifted, then left to cure before any finish is replaced.

What sets us apart

Why Abraj Al Azl?

The reinforcement is protectedStopping the water before it reaches the steel protects the slab and limits costs that grow the longer the treatment waits.

Your request from Al Boweibiya comes to usCall or WhatsApp on one number, and we answer you ourselves.

We serve Al Boweibiya and around itIncluding Down Town, Ar Rafiah and Al Andalus (near Ar Rafiah), as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on tiled roof waterproofing in Al Boweibiya

Do older roofs in Al Boweibiya carry stacked tile layers?

This is common in older buildings altered over several stages. We check the photos to see whether the layers are sound, since what lies beneath determines the waterproofing method.

Do you serve the newer quarters of Al Boweibiya?

Yes, we serve all of Al Boweibiya. Send photos of the roof with the quarter named, and tell us about any joins between sections of the roof so they can be considered.

Why does the stain appear far from where the water entered?

Water enters through the joints or a critical point then travels horizontally inside the concrete or between layers until it finds somewhere to come through, so the stain appears below a completely different point. That is why a tiled roof needs a thorough inspection, not just of the area above the stain.

Can the work be done in the summer heat?

Yes, though the heat affects how long some materials take to cure and can speed the drying of wet-applied coatings. The waterproofing material is chosen with the expected temperature in mind and the method of application adjusted accordingly. Send photos at any time of year and we will advise what suits the conditions.

What is different about waterproofing a tiled roof compared with a bare concrete roof?

A bare concrete roof is cleaned and the layer goes straight on. A tiled roof adds an extra assessment step: keep the tiles or lift them. The joints are also treated with materials that suit the expansion and contraction from heat, which matters considerably.

Is Al Boweibiya within your service area?

Yes, Al Boweibiya is one of the areas we work in, as are Down Town, Ar Rafiah and Al Andalus (near Ar Rafiah). To start, call us or message us on WhatsApp.

Nearby areas

We also offer it in neighbouring areas

We also offer tiled roof waterproofing in Down Town, Ar Rafiah and Al Andalus (near Ar Rafiah), among the closest areas to Al Boweibiya.

Other services in the area

More services in Al Boweibiya

White insulated dome on a roof among the houses

Your first step in Al Boweibiya:
a call or a WhatsApp message

Call us or send photos of the roof and the stains on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp