Abraj Al AzlContracting
Call العربية
White stepped dome on an insulated roof above a street

Tiled roof waterproofing in Al Badi (near Al Awjam)

The leak hides under the tiles

Waterproofing for tiled roofs, covering tile joints, the layer beneath and all surrounding points

+966 54 311 2066
The service in your area

Tiled roof waterproofing in Al Badi (near Al Awjam)

Tiled roof waterproofing in Al Badi starts with roof photos, sent by call or WhatsApp. The district combines houses with pitched tile roofs and flatter sections, and water most often finds its way through the join between the two.

Al Badi has houses with a varied mix of roof forms, so one house may have a pitched tiled wing beside a flat concrete wing. Where a tiled slope meets a flat roof is a common place for water to enter, as is an edge where tiles overhang a parapet. Dust and debris blown onto roofs can also collect in joints and hold moisture above the layer beneath. Photos of each roof section show how the parts connect and which joint is responsible.

  • Al Badi is a district in the Eastern Province, close to Al Badiah and Al Awjam.
  • Where a pitched roof meets a flat one, the joint needs its own detailing, separate from the tiles.
What the service includes

The main items of tiled roof waterproofing in Al Badi (near Al Awjam)

  • Relaying the tiles or adding the protective layer once the waterproofing has cured
  • Treating hairline cracks and open joints
  • Cleaning the surface and clearing debris from the joints
  • Sealing around tank and AC bases and all drain openings
How we work

From first contact to the finished job in Al Badi (near Al Awjam)

1

Send photos of the roof

On WhatsApp: photos of the joints, any loose tiles, the parapet, the tank and AC bases and any stains on the ceiling inside, so we can judge whether to waterproof over the tiles or lift them.

2

Inspect and clean

The roof is inspected carefully, the joints and cracks are cleaned of dust and debris, and any point that needs spot treatment is marked before the waterproof layer goes on.

3

Treat cracks and critical points

Hairline cracks and open joints are treated, and the points around tank and AC bases, drain openings and the parapet edge are sealed before the general layer is applied.

4

Apply the layer and the protection

The waterproof layer that suits the surface condition is applied, either over the tiles or on the concrete slab after the tiles are lifted, then left to cure before any finish is replaced.

What sets us apart

Why Abraj Al Azl?

The reinforcement is protectedStopping the water before it reaches the steel protects the slab and limits costs that grow the longer the treatment waits.

We serve Al Badi (near Al Awjam) and around itIncluding Al Badiah, Al Awjam and Al Aujam, as part of our work across the Eastern Province.

Your request from Al Badi (near Al Awjam) comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on tiled roof waterproofing in Al Badi (near Al Awjam)

How is the joint between a tiled slope and a flat section treated?

The joint is examined on its own, since it moves differently from the tiles and the flat concrete. Photos of where the two sections meet let us explain which parts need sealing and how the work could be arranged.

Should I send photos of the whole roof or only the leak?

Send both. A wide view shows how the roof sections relate to one another, and a close view shows the damaged tiles or joint. Together they help us identify where the water is coming from before discussing any method.

What is different about waterproofing a tiled roof compared with a bare concrete roof?

A bare concrete roof is cleaned and the layer goes straight on. A tiled roof adds an extra assessment step: keep the tiles or lift them. The joints are also treated with materials that suit the expansion and contraction from heat, which matters considerably.

Does waterproofing over the tiles change how the roof looks?

It depends on the layer used. Some layers are nearly clear and keep the tile colour, others give a uniform finish. We decide the layer type from the surface condition and what it needs. The overall look usually does not change in a way that stands out.

Is Al Badi (near Al Awjam) within your service area?

Yes, Al Badi (near Al Awjam) is one of the areas we work in, as are Al Badiah, Al Awjam and Al Aujam. To start, call us or message us on WhatsApp.

Can the work be done in the summer heat?

Yes, though the heat affects how long some materials take to cure and can speed the drying of wet-applied coatings. The waterproofing material is chosen with the expected temperature in mind and the method of application adjusted accordingly. Send photos at any time of year and we will advise what suits the conditions.

Nearby areas

Areas near Al Badi (near Al Awjam)

We also offer tiled roof waterproofing in Al Badiah, Al Awjam and Al Aujam, among the closest areas to Al Badi (near Al Awjam).

Other services in the area

More services in Al Badi (near Al Awjam)

White insulated dome on a roof among the houses

We start with you in Al Badi (near Al Awjam)
with one call

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp