Abraj Al AzlContracting
Call العربية
Worker applying the white insulation layer on a villa roof by the sea

Roof waterproofing in second industrial (near Dhahran)

The roof needs waterproofing

Treating rain and damp on house and villa roofs and exposed concrete slabs

+966 54 311 2066
The service in your area

Roof waterproofing in second industrial (near Dhahran)

Roof waterproofing in the Second Industrial district starts with WhatsApp photos of the roof, leaks and damp. The area has warehouses, small workshops and light industrial buildings whose exposed roofs face direct sun and rare but heavy rains.

Industrial buildings and workshops here typically have exposed concrete roofs or corrugated metal, stressed year-round by intense heat which cracks and rusts them. Heavy rain, when it falls, can breach small cracks and weak joints. The waterproofing method depends on the roof type, its area and current state, which the photos will clarify before work begins.

  • The Second Industrial district is an industrial area in the Eastern Province, near Al Jud, Al Hazm and Al Iskan Al Janubi.
  • Exposed industrial roofs heat intensely by day and cool rapidly at night, causing continuous expansion and contraction in materials.
What the service includes

The main items of roof waterproofing in second industrial (near Dhahran)

  • Cleaning the surface and removing loose or blistered old layers
  • Turning the layer up at the parapet and leaving it to dry and cure
  • Applying the layer suited to the surface type and its condition
  • Checking the concrete slab and mapping cracks, joints and weak points
How we work

This is how we work in second industrial (near Dhahran)

1

Send photos of the roof

On WhatsApp: photos of the roof surface, the parapet, any visible leak points, drain openings, AC bases and tank stands, so we can decide the right treatment.

2

Check the surface and find the weak points

The surface is checked, cracks, joints, blisters and the state of any old layer are noted, and it is decided whether the old layer must come off or can be treated over.

3

Clean and treat cracks and joints

The surface is cleaned of dust, loose material and old failing layers, and hairline cracks, parapet joints and the edges of AC bases are treated before any waterproof layer is applied.

4

Apply the layer and leave it to cure

The right layer for the surface type and its condition is applied, turned up at the parapet and closed around every drain opening and tank stand, then left to dry and cure.

What sets us apart

Why Abraj Al Azl?

The concrete stays dryA continuous waterproof layer keeps water from the reinforcement and slows slab cracking over time.

Your request from second industrial (near Dhahran) comes to usCall or WhatsApp on one number, and we answer you ourselves.

second industrial (near Dhahran) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about roof waterproofing in second industrial (near Dhahran)

Can a corrugated metal roof in the Second Industrial district be waterproofed?

Yes, but the method differs from concrete. Photos will show the metal's condition and any rust, and the waterproofing material will be chosen to suit.

When should a leak from a workshop roof be treated before damage spreads?

As soon as you notice damp or leak marks, send photos for assessment. Delay lets water reach interior structures and damage the foundation.

Can a concrete roof be waterproofed over the old layer?

It depends on the state of the old layer. If it is firm and fully bonded it may be possible to treat over it. If it is blistered, loose or deeply cracked it must come off first so the new layer bonds directly to the concrete. Photos let us judge which fits.

What decides the cost of waterproofing a roof?

The size of the roof, its condition, the type of layer needed, whether tiles or an old waterproofing layer must come off, and how many critical points there are such as AC bases, tank stands and drain openings. Send photos and rough dimensions on WhatsApp and we will suggest the right treatment.

Does treating roof damp also fix the heat in the top-floor rooms?

No. Treating a water leak stops the water but does not block the heat. A hot ceiling in summer is a separate problem that needs a heat-insulating layer or a reflective coating. The roof heat insulation service explains that family of solutions.

Do you cover second industrial (near Dhahran)?

Yes. We serve second industrial (near Dhahran) and nearby areas such as Al Jud, Al Hazm (near Dhahran) and Al Iskan Al Janubi, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Nearby areas

We also offer it in neighbouring areas

We also work near second industrial (near Dhahran), in Al Jud, Al Hazm (near Dhahran) and Al Iskan Al Janubi.

Other services in the area

More services in second industrial (near Dhahran)

Empty seaside pool during waterproofing

In second industrial (near Dhahran) and need roof waterproofing?
Send us photos of the spot

Describe the problem and where it is in second industrial (near Dhahran), and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp