Abraj Al AzlContracting
Call العربية
Worker laying a black bitumen roll across a villa roof and turning it up the parapet

Bitumen roof waterproofing in Usayfirat

Bitumen seals the roof

Bitumen membrane waterproofing for flat house and villa roofs

+966 54 311 2066
The service in your area

Bitumen roof waterproofing in Usayfirat

Bitumen roof waterproofing in Usayfirat begins with a photo of the roof, sent by call or WhatsApp. This is a small hamlet of a limited number of houses near Salasil, Shari and Abu Koola, and each roof has its own conditions.

Houses in small hamlets are often detached buildings with flat roofs used for storage or sitting, so they see more foot traffic and furniture than unused roofs. The bitumen membrane has to tolerate that use, which is considered when choosing the protective layer. Because roofs in a hamlet differ in age and tightness, the method is only fixed after each roof is looked at separately in the photos.

  • Usayfirat is a small hamlet in the Al-Ahsa governorate of the Eastern Province, near Salasil and Shari.
  • A roof used for sitting or storage needs a tougher protective layer than an unused one.
What the service includes

What the service covers in Usayfirat

  • Cleaning the surface and treating hairline cracks and joints
  • Laying bitumen rolls in overlapping strips and bonding them
  • Closing the layer around AC bases, the tank stand and drain openings
  • Adding the protective layer over the bitumen once it has cured
How we work

The stages of the work in Usayfirat

1

Send photos of the roof

On WhatsApp: photos of the roof surface, the parapet, the AC bases, the tank stand and the drain outlets, so we can read the condition and decide the right treatment.

2

Clean the surface and treat cracks

The surface is cleaned of dust and debris, and hairline cracks, joints and wider cracks are treated before any roll goes down, because a membrane cannot seal over a crumbling surface.

3

Lay the bitumen rolls

The rolls are laid in overlapping strips and bonded by heat or adhesive depending on the type, then turned up at the parapet and closed tightly around AC bases, the tank stand and drain openings to form one continuous layer.

4

Protect the membrane on top

A protective layer is added over the rolls depending on the surface and how it is used, to shield the bitumen from direct sun and from wear, and to extend the life of the membrane.

What sets us apart

Why Abraj Al Azl?

One continuous layer, no gapsOverlapping rolls and sealed edges stop water from finding a path under the membrane at any join.

We serve Usayfirat and around itIncluding Salasil, Shari and Abu Koola, as part of our work across the Eastern Province.

Your request from Usayfirat comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Usayfirat

Can a roof we sit on in Usayfirat be waterproofed with bitumen?

Yes, with a protective layer suited to use. We set the protective layer after seeing the roof and how it is used, in the photos and description.

How long does a roof job in Usayfirat take?

The duration depends on the roof's area, its condition and how much repair it needs, and we give no fixed time before reviewing the photos. We explain what your roof requires once we have seen it.

Why is the bitumen turned up at the parapet?

Water does not only get in from the middle of the roof. It gets in where the membrane meets the parapet. Turning the roll up at the wall closes that joint and stops water from entering at the edge and travelling under the membrane.

Is Usayfirat within your service area?

Yes, Usayfirat is one of the areas we work in, as are Salasil, Shari and Abu Koola. To start, call us or message us on WhatsApp.

What is the difference between bitumen rolls and a liquid waterproof coating on a roof?

Bitumen rolls are a solid continuous layer bonded by heat or adhesive, thick and resistant to tearing. A liquid coating is poured or brushed on and sets in place. The choice depends on the roof surface, how level it is and how the water drains. Photos help us decide which fits your roof.

What should I expect once the work is done?

The roof will be covered with a continuous bitumen membrane, turned up at the edges and around all projecting elements, with a protective layer on top. The membrane must be left to cure fully before the roof is used again, and we tell you when it is ready when the work is agreed.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: Salasil, Shari and Abu Koola.

Other services in the area

More services in Usayfirat

Empty garden pool during waterproofing work

Your first step in Usayfirat:
a call or a WhatsApp message

Describe the problem and where it is in Usayfirat, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp