Abraj Al AzlContracting
Call العربية
Worker laying a black bitumen roll across a villa roof and turning it up the parapet

Bitumen roof waterproofing in Sudayr

Bitumen seals the roof

Bitumen membrane waterproofing for flat house and villa roofs

+966 54 311 2066
The service in your area

Bitumen roof waterproofing in Sudayr

We waterproof roofs with bitumen in Sudayr after reviewing photos of the roof you send by call or WhatsApp. The district combines varied houses and buildings with flat roofs, and the work differs with each building's age and the condition of its layer.

Sudayr blends houses and small buildings with flat roofs, some built long ago and some recent. Older roofs show cracking and peeling of the bitumen layer at the edges and around openings, while newer ones usually need periodic maintenance. The building type and age determine what is needed, and the photos show this before any method is chosen.

  • Sudayr is a district in the Eastern Province, close to Alahsaa, Al Fanatir and Makkah.
  • Older roofs need the edges and openings checked most closely, since those are where peeling starts.
What the service includes

What the service covers in Sudayr

  • Cleaning the surface and treating hairline cracks and joints
  • Closing the layer around AC bases, the tank stand and drain openings
  • Inspecting the roof and locating cracks and leak points
  • Laying bitumen rolls in overlapping strips and bonding them
How we work

This is how we work in Sudayr

1

Send photos of the roof

On WhatsApp: photos of the roof surface, the parapet, the AC bases, the tank stand and the drain outlets, so we can read the condition and decide the right treatment.

2

Clean the surface and treat cracks

The surface is cleaned of dust and debris, and hairline cracks, joints and wider cracks are treated before any roll goes down, because a membrane cannot seal over a crumbling surface.

3

Lay the bitumen rolls

The rolls are laid in overlapping strips and bonded by heat or adhesive depending on the type, then turned up at the parapet and closed tightly around AC bases, the tank stand and drain openings to form one continuous layer.

4

Protect the membrane on top

A protective layer is added over the rolls depending on the surface and how it is used, to shield the bitumen from direct sun and from wear, and to extend the life of the membrane.

What sets us apart

Why Abraj Al Azl?

One continuous layer, no gapsOverlapping rolls and sealed edges stop water from finding a path under the membrane at any join.

Your request from Sudayr comes to usCall or WhatsApp on one number, and we answer you ourselves.

Sudayr is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Sudayr

Are newer roofs in Sudayr treated the same way as older ones?

Not necessarily. Newer roofs may only need the top layer renewed, while older ones may need the peeling removed first. The photos will show which applies.

How can I tell if my Sudayr roof needs new waterproofing?

Look for peeling or cracking of the layer or damp patches on the ceiling below. Send photos of the roof and we will assess together whether action is needed.

What should I expect once the work is done?

The roof will be covered with a continuous bitumen membrane, turned up at the edges and around all projecting elements, with a protective layer on top. The membrane must be left to cure fully before the roof is used again, and we tell you when it is ready when the work is agreed.

How do I request bitumen roof waterproofing in Sudayr?

Call us, or send clear photos of the spot and its location in Sudayr on WhatsApp, and we will work out the next step with you.

Can bitumen rolls be laid directly over an old waterproof layer?

It depends on the condition of the old layer. If it is intact and well bonded, the new rolls may go over it after cleaning and repair. If it is blistered, peeling or lifted in places, it is better removed first. Send photos of the roof so we can see the condition.

What decides the cost of bitumen roof waterproofing?

The size of the roof and its condition, the number of cracks and joints that need treatment, the number of details to seal such as AC bases, the tank stand and drain outlets, and whether an old layer needs removing. Send photos and rough dimensions on WhatsApp and we will work out the treatment.

Nearby areas

We also offer it in neighbouring areas

Nearby areas we also cover: Alahsaa (near Al Fadili), Al Fanatir and Makkah.

Other services in the area

More services in Sudayr

Empty garden pool during waterproofing work

Bitumen roof waterproofing in Sudayr?
Call us now

Describe the problem and where it is in Sudayr, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp