
Bitumen roof waterproofing in Sihmah
We waterproof roofs with bitumen in Sihmah, a small town in the Eastern Province, starting from photos sent by call or WhatsApp. Roofs in small towns mix old and newer homes, which affects the right approach for each roof.
The town is made up of older homes alongside newer ones, and some roofs have been waterproofed before with different materials. Older layers can peel and separate from the concrete over time, so they must be checked before a new layer goes on top. The photos help tell apart a roof that needs local repair from one that needs full lining.
- Sihmah is a small town in the Eastern Province, close to Maaqla, Al Qulayyib and Al Uyaynah, with a mix of older and newer homes.
- An old waterproofing layer that has separated from the concrete needs partial removal before any new layer.
The main items of bitumen roof waterproofing in Sihmah
- Adding the protective layer over the bitumen once it has cured
- Cleaning the surface and treating hairline cracks and joints
- Laying bitumen rolls in overlapping strips and bonding them
- Turning the layer up at the parapet and sealing all edges
The steps of bitumen roof waterproofing in Sihmah
Send photos of the roof
On WhatsApp: photos of the roof surface, the parapet, the AC bases, the tank stand and the drain outlets, so we can read the condition and decide the right treatment.
Clean the surface and treat cracks
The surface is cleaned of dust and debris, and hairline cracks, joints and wider cracks are treated before any roll goes down, because a membrane cannot seal over a crumbling surface.
Lay the bitumen rolls
The rolls are laid in overlapping strips and bonded by heat or adhesive depending on the type, then turned up at the parapet and closed tightly around AC bases, the tank stand and drain openings to form one continuous layer.
Protect the membrane on top
A protective layer is added over the rolls depending on the surface and how it is used, to shield the bitumen from direct sun and from wear, and to extend the life of the membrane.
Why Abraj Al Azl?
Protection for the reinforcementWater that reaches the reinforcement causes rust and weakens the slab. Sealing the roof early stops that path.
Start from Sihmah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
We serve Sihmah and around itIncluding Maaqla, Al Qulayyib and Al Uyaynah, as part of our work across the Eastern Province.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Questions about bitumen roof waterproofing in Sihmah
Can bitumen be placed over an old waterproofing layer in Sihmah?
Sometimes, if the old layer is firmly bonded and sound. If it has separated or peeled, partial removal is necessary, and the photos will confirm that before we decide.
What do you check on an older Sihmah roof before waterproofing?
We check the condition of the old layer and how well it is bonded to the concrete, the position of cracks, and the area around entries and drains. These decide whether full lining is necessary.
Does the dark surface of bitumen make the rooms below hotter?
Yes, a dark surface absorbs more heat than a white reflective coating. If the main goal is cutting the heat in the rooms below, there are dedicated heat-insulation treatments. If the goal is stopping the leak, bitumen does that job, and a reflective layer can sometimes be added over it depending on the surface.
Is Sihmah within your service area?
Yes, Sihmah is one of the areas we work in, as are Maaqla, Al Qulayyib and Al Uyaynah. To start, call us or message us on WhatsApp.
Can bitumen rolls be laid directly over an old waterproof layer?
It depends on the condition of the old layer. If it is intact and well bonded, the new rolls may go over it after cleaning and repair. If it is blistered, peeling or lifted in places, it is better removed first. Send photos of the roof so we can see the condition.
What should I expect once the work is done?
The roof will be covered with a continuous bitumen membrane, turned up at the edges and around all projecting elements, with a protective layer on top. The membrane must be left to cure fully before the roof is used again, and we tell you when it is ready when the work is agreed.
Bitumen roof waterproofing near Sihmah
We also offer bitumen roof waterproofing in Maaqla, Al Qulayyib and Al Uyaynah, among the closest areas to Sihmah.
More services in Sihmah
