Abraj Al AzlContracting
Call العربية
Worker laying a black bitumen roll across a villa roof and turning it up the parapet

Bitumen roof waterproofing in Ash Shihiyah

Bitumen seals the roof

Bitumen membrane waterproofing for flat house and villa roofs

+966 54 311 2066
The service in your area

Bitumen roof waterproofing in Ash Shihiyah

Bitumen roof waterproofing in Ash Shihiyah begins with photos and details of the roof sent by call or WhatsApp. The village has scattered houses and villas, with bare roofs directly exposed to summer heat and aridity.

Ash Shihiyah is a village of scattered houses and villas across wide plots, where bare roofs face scorching sun and dry air. Bitumen contracts and expands with large temperature swings, potentially causing cracks over time. Photos help us assess the roof's current state and whether leaks or problems have already appeared.

  • Ash Shihiyah is a village in the Eastern Province, near Al Wahah and Al Majd, with scattered houses and villas across wide areas.
  • Villas in small villages often have fully exposed roofs without shade, amplifying heat stress on the waterproofing material.
What the service includes

What we do for you in Ash Shihiyah

  • Adding the protective layer over the bitumen once it has cured
  • Inspecting the roof and locating cracks and leak points
  • Laying bitumen rolls in overlapping strips and bonding them
  • Cleaning the surface and treating hairline cracks and joints
How we work

The stages of the work in Ash Shihiyah

1

Send photos of the roof

On WhatsApp: photos of the roof surface, the parapet, the AC bases, the tank stand and the drain outlets, so we can read the condition and decide the right treatment.

2

Clean the surface and treat cracks

The surface is cleaned of dust and debris, and hairline cracks, joints and wider cracks are treated before any roll goes down, because a membrane cannot seal over a crumbling surface.

3

Lay the bitumen rolls

The rolls are laid in overlapping strips and bonded by heat or adhesive depending on the type, then turned up at the parapet and closed tightly around AC bases, the tank stand and drain openings to form one continuous layer.

4

Protect the membrane on top

A protective layer is added over the rolls depending on the surface and how it is used, to shield the bitumen from direct sun and from wear, and to extend the life of the membrane.

What sets us apart

Why Abraj Al Azl?

One continuous layer, no gapsOverlapping rolls and sealed edges stop water from finding a path under the membrane at any join.

We serve Ash Shihiyah and around itIncluding Al Wahah (near Ash Shihiyah), Al Majd and Al Wurud (near Ash Shihiyah), as part of our work across the Eastern Province.

Ash Shihiyah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Ash Shihiyah

What is the difference between waterproofing a new and an old roof in Ash Shihiyah?

A new roof may need basic lining, while an old roof may have cracks or leaks requiring repair first. Photos make the condition clear, and this determines the work type and materials needed.

Can a villa roof be waterproofed with bitumen during summer in Ash Shihiyah?

It depends on temperature and roof conditions. Extreme heat affects how the material is applied and dries. Send photos and details, and we will advise on the best timing and methods.

Does the dark surface of bitumen make the rooms below hotter?

Yes, a dark surface absorbs more heat than a white reflective coating. If the main goal is cutting the heat in the rooms below, there are dedicated heat-insulation treatments. If the goal is stopping the leak, bitumen does that job, and a reflective layer can sometimes be added over it depending on the surface.

How do I request bitumen roof waterproofing in Ash Shihiyah?

Call us, or send clear photos of the spot and its location in Ash Shihiyah on WhatsApp, and we will work out the next step with you.

What decides the cost of bitumen roof waterproofing?

The size of the roof and its condition, the number of cracks and joints that need treatment, the number of details to seal such as AC bases, the tank stand and drain outlets, and whether an old layer needs removing. Send photos and rough dimensions on WhatsApp and we will work out the treatment.

Can bitumen rolls be laid directly over an old waterproof layer?

It depends on the condition of the old layer. If it is intact and well bonded, the new rolls may go over it after cleaning and repair. If it is blistered, peeling or lifted in places, it is better removed first. Send photos of the roof so we can see the condition.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: Al Wahah (near Ash Shihiyah), Al Majd and Al Wurud (near Ash Shihiyah).

Other services in the area

More services in Ash Shihiyah

Empty garden pool during waterproofing work

In Ash Shihiyah and need bitumen roof waterproofing?
Send us photos of the spot

Describe the problem and where it is in Ash Shihiyah, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp