
Bitumen roof waterproofing in Al Muruj (near Qaryah al Ulya)
Bitumen roof waterproofing in Al Muruj, in the Eastern Province, begins with photos of the roof sent by call or WhatsApp. This part of the district is made of family houses and villas near Qaryah al Ulya, Az Zuhur and Ar Rawdah, where roofs were often extended over time and older and newer sections meet.
Houses here are mostly family homes where a roof slab was carried over an extension, so an old and a new section often sit side by side at different heights. The step between them is where a bitumen membrane is most likely to fail, because water pools against the higher wall. Parapets, roof hatches and the edges of the older slab need the same attention as the open field. Photos of the join and the drain points will show what the membrane has to cover.
- Al Muruj is a district of the Eastern Province, with Qaryah al Ulya, Az Zuhur and Ar Rawdah among its nearest places.
- Where an older roof meets a newer one, the step must be flashed so water runs away from the join.
The scope of the work in Al Muruj (near Qaryah al Ulya)
- Inspecting the roof and locating cracks and leak points
- Closing the layer around AC bases, the tank stand and drain openings
- Laying bitumen rolls in overlapping strips and bonding them
- Cleaning the surface and treating hairline cracks and joints
How we carry out bitumen roof waterproofing in Al Muruj (near Qaryah al Ulya)
Send photos of the roof
On WhatsApp: photos of the roof surface, the parapet, the AC bases, the tank stand and the drain outlets, so we can read the condition and decide the right treatment.
Clean the surface and treat cracks
The surface is cleaned of dust and debris, and hairline cracks, joints and wider cracks are treated before any roll goes down, because a membrane cannot seal over a crumbling surface.
Lay the bitumen rolls
The rolls are laid in overlapping strips and bonded by heat or adhesive depending on the type, then turned up at the parapet and closed tightly around AC bases, the tank stand and drain openings to form one continuous layer.
Protect the membrane on top
A protective layer is added over the rolls depending on the surface and how it is used, to shield the bitumen from direct sun and from wear, and to extend the life of the membrane.
Why Abraj Al Azl?
One continuous layer, no gapsOverlapping rolls and sealed edges stop water from finding a path under the membrane at any join.
Al Muruj (near Qaryah al Ulya) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
Bitumen roof waterproofing in Al Muruj (near Qaryah al Ulya)We choose the method and the materials once we know the condition of the spot.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
أفضل شركة عزل اسطح الفوم وخزانات المياه
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
Real Google reviews, shown exactly as their authors wrote them.
Your questions on bitumen roof waterproofing in Al Muruj (near Qaryah al Ulya)
Can you treat a roof where two sections meet?
Yes, the join is usually the first thing we check in the photos. The membrane is taken up over the step and sealed at the wall, and the exact detail depends on what the photos show.
Will the membrane need to match the old roof?
Not always. The existing surface is checked for soundness and cleaned, and we explain whether it can take the new membrane or needs preparing first. The photos decide which route is suitable.
Does the dark surface of bitumen make the rooms below hotter?
Yes, a dark surface absorbs more heat than a white reflective coating. If the main goal is cutting the heat in the rooms below, there are dedicated heat-insulation treatments. If the goal is stopping the leak, bitumen does that job, and a reflective layer can sometimes be added over it depending on the surface.
Do you offer bitumen roof waterproofing in Al Muruj (near Qaryah al Ulya)?
Yes. Al Muruj (near Qaryah al Ulya) is within our service area in the Eastern Province, and we also work in Qaryah al Ulya, Az Zuhur (near Qaryah al Ulya) and Ar Rawdah (near Qaryah al Ulya). Call us or send photos of the spot on WhatsApp.
What decides the cost of bitumen roof waterproofing?
The size of the roof and its condition, the number of cracks and joints that need treatment, the number of details to seal such as AC bases, the tank stand and drain outlets, and whether an old layer needs removing. Send photos and rough dimensions on WhatsApp and we will work out the treatment.
What is the difference between bitumen rolls and a liquid waterproof coating on a roof?
Bitumen rolls are a solid continuous layer bonded by heat or adhesive, thick and resistant to tearing. A liquid coating is poured or brushed on and sets in place. The choice depends on the roof surface, how level it is and how the water drains. Photos help us decide which fits your roof.
Areas near Al Muruj (near Qaryah al Ulya)
We also offer bitumen roof waterproofing in Qaryah al Ulya, Az Zuhur (near Qaryah al Ulya) and Ar Rawdah (near Qaryah al Ulya), among the closest areas to Al Muruj (near Qaryah al Ulya).
More services in Al Muruj (near Qaryah al Ulya)
