
Bitumen roof waterproofing in Al Muruj (near Tarout)
We waterproof roofs in Al Muruj with bitumen once photos of the roof reach us by call or WhatsApp. The district has houses and villas on flat roofs, close to the Jamiyin, Sinaiyah and Rawdah areas, and we set the work according to what the photos show.
Al Muruj's buildings are a mix of houses, villas and small multi-storey blocks, and their flat concrete roofs take the heat and dust, so grime builds up on the membrane and hides weak spots. These roofs need thorough cleaning before covering, because dust stops proper bonding. The photos show the condition of the roof before any work begins.
- Al Muruj is a residential district in Dammam in the Eastern Province, lying close to Al Jamiyin, As Sinaiyah and Ar Rawdah.
- A dusty roof does not bond well with a membrane, so cleaning comes before any application.
The main items of bitumen roof waterproofing in Al Muruj (near Tarout)
- Turning the layer up at the parapet and sealing all edges
- Cleaning the surface and treating hairline cracks and joints
- Closing the layer around AC bases, the tank stand and drain openings
- Laying bitumen rolls in overlapping strips and bonding them
The stages of the work in Al Muruj (near Tarout)
Send photos of the roof
On WhatsApp: photos of the roof surface, the parapet, the AC bases, the tank stand and the drain outlets, so we can read the condition and decide the right treatment.
Clean the surface and treat cracks
The surface is cleaned of dust and debris, and hairline cracks, joints and wider cracks are treated before any roll goes down, because a membrane cannot seal over a crumbling surface.
Lay the bitumen rolls
The rolls are laid in overlapping strips and bonded by heat or adhesive depending on the type, then turned up at the parapet and closed tightly around AC bases, the tank stand and drain openings to form one continuous layer.
Protect the membrane on top
A protective layer is added over the rolls depending on the surface and how it is used, to shield the bitumen from direct sun and from wear, and to extend the life of the membrane.
Why Abraj Al Azl?
One continuous layer, no gapsOverlapping rolls and sealed edges stop water from finding a path under the membrane at any join.
We serve Al Muruj (near Tarout) and around itIncluding Al Jamiyin (near Tarout), As Sinaiyah (near Tarout) and Ar Rawdah (near Tarout), as part of our work across the Eastern Province.
Start from Al Muruj (near Tarout) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Your questions on bitumen roof waterproofing in Al Muruj (near Tarout)
Does the roof need cleaning before waterproofing in Al Muruj?
Yes, built-up dust and dirt stop bitumen from bonding to the surface. The roof is cleaned thoroughly and then checked before the layer goes on.
Do multi-storey roofs in Al Muruj suit this waterproofing?
Flat ones suit it, and the photos show whether their condition allows covering. Wide roofs made up of several sections may need the work split along their joints.
Is Al Muruj (near Tarout) within your service area?
Yes, Al Muruj (near Tarout) is one of the areas we work in, as are Al Jamiyin (near Tarout), As Sinaiyah (near Tarout) and Ar Rawdah (near Tarout). To start, call us or message us on WhatsApp.
Can bitumen rolls be laid directly over an old waterproof layer?
It depends on the condition of the old layer. If it is intact and well bonded, the new rolls may go over it after cleaning and repair. If it is blistered, peeling or lifted in places, it is better removed first. Send photos of the roof so we can see the condition.
What should I expect once the work is done?
The roof will be covered with a continuous bitumen membrane, turned up at the edges and around all projecting elements, with a protective layer on top. The membrane must be left to cure fully before the roof is used again, and we tell you when it is ready when the work is agreed.
Why is the bitumen turned up at the parapet?
Water does not only get in from the middle of the roof. It gets in where the membrane meets the parapet. Turning the roll up at the wall closes that joint and stops water from entering at the edge and travelling under the membrane.
The same service in nearby areas
We also work near Al Muruj (near Tarout), in Al Jamiyin (near Tarout), As Sinaiyah (near Tarout) and Ar Rawdah (near Tarout).
More services in Al Muruj (near Tarout)
