
Bitumen roof waterproofing in Al Matar (near An Nabiyah)
Bitumen roof waterproofing in Al Matar, Dammam, starts with photos of the roof and edges sent by call or WhatsApp. The district has newer villas and homes alongside older ones, and roofs there differ in shape and use.
Homes in Al Matar range from relatively newer villas to older houses, and their roofs differ in size and use: some are wide sitting areas, others narrow storage spaces. Damage usually starts at the edges, around drainage outlets, and at railings. We decide what each roof needs from the photos without assuming in advance.
- Al Matar is a district of Dammam in the Eastern Province, near Al Amanah, Ash Shrouk, and Al Fursan.
- Railings and edges are fixed into the roof wall, and water can get under the layer there if the junction is not sealed properly.
The bitumen roof waterproofing work in Al Matar (near An Nabiyah)
- Turning the layer up at the parapet and sealing all edges
- Closing the layer around AC bases, the tank stand and drain openings
- Laying bitumen rolls in overlapping strips and bonding them
- Cleaning the surface and treating hairline cracks and joints
This is how we work in Al Matar (near An Nabiyah)
Send photos of the roof
On WhatsApp: photos of the roof surface, the parapet, the AC bases, the tank stand and the drain outlets, so we can read the condition and decide the right treatment.
Clean the surface and treat cracks
The surface is cleaned of dust and debris, and hairline cracks, joints and wider cracks are treated before any roll goes down, because a membrane cannot seal over a crumbling surface.
Lay the bitumen rolls
The rolls are laid in overlapping strips and bonded by heat or adhesive depending on the type, then turned up at the parapet and closed tightly around AC bases, the tank stand and drain openings to form one continuous layer.
Protect the membrane on top
A protective layer is added over the rolls depending on the surface and how it is used, to shield the bitumen from direct sun and from wear, and to extend the life of the membrane.
Why Abraj Al Azl?
One continuous layer, no gapsOverlapping rolls and sealed edges stop water from finding a path under the membrane at any join.
Bitumen roof waterproofing in Al Matar (near An Nabiyah)We choose the method and the materials once we know the condition of the spot.
Start from Al Matar (near An Nabiyah) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
أفضل شركة عزل اسطح الفوم وخزانات المياه
Real Google reviews, shown exactly as their authors wrote them.
Common questions on bitumen roof waterproofing in Al Matar (near An Nabiyah)
Do you treat railings and their edges as part of roof waterproofing in Al Matar?
Yes, we check the railing fixing points in the photos and treat them where needed. The details are set once we see the photos, not before.
Does waterproofing a newer villa roof in Al Matar differ from an older house?
It can differ in the condition of the existing layer and in the number of joints and edges. Send photos of each roof so we can compare the condition and pick the right approach for each.
Can bitumen rolls be laid directly over an old waterproof layer?
It depends on the condition of the old layer. If it is intact and well bonded, the new rolls may go over it after cleaning and repair. If it is blistered, peeling or lifted in places, it is better removed first. Send photos of the roof so we can see the condition.
Is Al Matar (near An Nabiyah) within your service area?
Yes, Al Matar (near An Nabiyah) is one of the areas we work in, as are Al Amanah, Ash Shrouk (near An Nabiyah) and Al Fursan. To start, call us or message us on WhatsApp.
What decides the cost of bitumen roof waterproofing?
The size of the roof and its condition, the number of cracks and joints that need treatment, the number of details to seal such as AC bases, the tank stand and drain outlets, and whether an old layer needs removing. Send photos and rough dimensions on WhatsApp and we will work out the treatment.
What is the difference between bitumen rolls and a liquid waterproof coating on a roof?
Bitumen rolls are a solid continuous layer bonded by heat or adhesive, thick and resistant to tearing. A liquid coating is poured or brushed on and sets in place. The choice depends on the roof surface, how level it is and how the water drains. Photos help us decide which fits your roof.
Areas near Al Matar (near An Nabiyah)
We also work near Al Matar (near An Nabiyah), in Al Amanah, Ash Shrouk (near An Nabiyah) and Al Fursan.
More services in Al Matar (near An Nabiyah)
