Abraj Al AzlContracting
Call العربية
Worker laying a black bitumen roll across a villa roof and turning it up the parapet

Bitumen roof waterproofing in Al Khawr

Bitumen seals the roof

Bitumen membrane waterproofing for flat house and villa roofs

+966 54 311 2066
The service in your area

Bitumen roof waterproofing in Al Khawr

Bitumen roof waterproofing in Al Khawr starts with WhatsApp photos of the roof and visible problems, followed by a call. The district has villas, apartment blocks and small commercial buildings with exposed roofs needing leak protection.

Al Khawr mixes residential blocks, shops and small buildings with roofs varying in age. Flat roofs face direct intense sun and pool water where there are dips and cracks. High heat and coastal humidity speed the decay of any old coating, and expansion and contraction open existing cracks. Bitumen gently seals these cracks and accommodates the roof's movement. Photos reveal the concrete's state, any old coating and leak locations.

  • Al Khawr is a district in the Eastern Province, close to Al Hamra, Sinaiyah Al Fawaziyah and Ibn Sina, with residential and commercial buildings.
  • Roofs in mixed residential and commercial districts often leak due to cracks and inadequate drainage.
What the service includes

What the service covers in Al Khawr

  • Cleaning the surface and treating hairline cracks and joints
  • Turning the layer up at the parapet and sealing all edges
  • Inspecting the roof and locating cracks and leak points
  • Laying bitumen rolls in overlapping strips and bonding them
How we work

The steps of bitumen roof waterproofing in Al Khawr

1

Send photos of the roof

On WhatsApp: photos of the roof surface, the parapet, the AC bases, the tank stand and the drain outlets, so we can read the condition and decide the right treatment.

2

Clean the surface and treat cracks

The surface is cleaned of dust and debris, and hairline cracks, joints and wider cracks are treated before any roll goes down, because a membrane cannot seal over a crumbling surface.

3

Lay the bitumen rolls

The rolls are laid in overlapping strips and bonded by heat or adhesive depending on the type, then turned up at the parapet and closed tightly around AC bases, the tank stand and drain openings to form one continuous layer.

4

Protect the membrane on top

A protective layer is added over the rolls depending on the surface and how it is used, to shield the bitumen from direct sun and from wear, and to extend the life of the membrane.

What sets us apart

Why Abraj Al Azl?

One continuous layer, no gapsOverlapping rolls and sealed edges stop water from finding a path under the membrane at any join.

We serve Al Khawr and around itIncluding Al Hamra (near Al Khobar), Sinaiyah Al Fawaziyah and Ibn Sina, as part of our work across the Eastern Province.

Bitumen roof waterproofing in Al KhawrWe choose the method and the materials once we know the condition of the spot.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bitumen roof waterproofing in Al Khawr

Do you treat cracks and leaks before applying bitumen in Al Khawr?

Yes, we first treat cracks, joints and damp areas to clean them and ensure the surface is ready. Then bitumen is applied for lasting protection. Photos and the initial call determine how much repair is needed.

Can older roofs on small shops be waterproofed?

Yes, when the base concrete is sound. We remove the failed old coating, clean the roof, then apply new bitumen. Photos tell us whether the condition allows this.

What decides the cost of bitumen roof waterproofing?

The size of the roof and its condition, the number of cracks and joints that need treatment, the number of details to seal such as AC bases, the tank stand and drain outlets, and whether an old layer needs removing. Send photos and rough dimensions on WhatsApp and we will work out the treatment.

Why is the bitumen turned up at the parapet?

Water does not only get in from the middle of the roof. It gets in where the membrane meets the parapet. Turning the roll up at the wall closes that joint and stops water from entering at the edge and travelling under the membrane.

What is the difference between bitumen rolls and a liquid waterproof coating on a roof?

Bitumen rolls are a solid continuous layer bonded by heat or adhesive, thick and resistant to tearing. A liquid coating is poured or brushed on and sets in place. The choice depends on the roof surface, how level it is and how the water drains. Photos help us decide which fits your roof.

Is Al Khawr within your service area?

Yes, Al Khawr is one of the areas we work in, as are Al Hamra (near Al Khobar), Sinaiyah Al Fawaziyah and Ibn Sina. To start, call us or message us on WhatsApp.

Nearby areas

Bitumen roof waterproofing near Al Khawr

We also work near Al Khawr, in Al Hamra (near Al Khobar), Sinaiyah Al Fawaziyah and Ibn Sina.

Other services in the area

More services in Al Khawr

Empty garden pool during waterproofing work

Bitumen roof waterproofing in Al Khawr?
Call us now

Describe the problem and where it is in Al Khawr, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp