Abraj Al AzlContracting
Call العربية
Worker laying a black bitumen roll across a villa roof and turning it up the parapet

Bitumen roof waterproofing in Al Jisr

Bitumen seals the roof

Bitumen membrane waterproofing for flat house and villa roofs

+966 54 311 2066
The service in your area

Bitumen roof waterproofing in Al Jisr

Bitumen roof waterproofing in Al Jisr begins with photos of your roof, sent to us by call or WhatsApp. Most of the district is houses and villas with flat concrete roofs, where water gathers after rain and the surface takes the sun all day.

Al Jisr is a residential district dominated by houses and villas, and their roofs were built at different times, so their condition varies. Bitumen bonds well to an old surface that is firm and free of loose material, whereas cracked or blistered areas need preparing before the new membrane goes on. Pipe penetrations, roof stairs and rooftop tanks each call for their own detailed treatment. The photos show which parts of the roof need attention first.

  • Al Jisr is a district in Hofuf, Al-Ahsa, lying close to Ishbiliya, Al Hamra and Al Khuzama.
  • Water most often collects at the edges and drain outlets, which is where seepage under a membrane usually begins.
What the service includes

The main items of bitumen roof waterproofing in Al Jisr

  • Closing the layer around AC bases, the tank stand and drain openings
  • Cleaning the surface and treating hairline cracks and joints
  • Laying bitumen rolls in overlapping strips and bonding them
  • Turning the layer up at the parapet and sealing all edges
How we work

How we carry out bitumen roof waterproofing in Al Jisr

1

Send photos of the roof

On WhatsApp: photos of the roof surface, the parapet, the AC bases, the tank stand and the drain outlets, so we can read the condition and decide the right treatment.

2

Clean the surface and treat cracks

The surface is cleaned of dust and debris, and hairline cracks, joints and wider cracks are treated before any roll goes down, because a membrane cannot seal over a crumbling surface.

3

Lay the bitumen rolls

The rolls are laid in overlapping strips and bonded by heat or adhesive depending on the type, then turned up at the parapet and closed tightly around AC bases, the tank stand and drain openings to form one continuous layer.

4

Protect the membrane on top

A protective layer is added over the rolls depending on the surface and how it is used, to shield the bitumen from direct sun and from wear, and to extend the life of the membrane.

What sets us apart

Why Abraj Al Azl?

One continuous layer, no gapsOverlapping rolls and sealed edges stop water from finding a path under the membrane at any join.

Al Jisr is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Your request from Al Jisr comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Jisr

Can bitumen be laid over an old roof surface in Al Jisr?

This can be possible if the old surface is firm and free of loose material. Blistered or peeling areas are cut out and repaired first, and the photos help us judge this before any decision is made.

What decides the waterproofing method for a house roof in Al Jisr?

It is decided by the state of the concrete and by the openings, stairs and rooftop tanks present. We settle the method once we have seen the photos, and explain which parts need special treatment.

Is Al Jisr within your service area?

Yes, Al Jisr is one of the areas we work in, as are Ishbiliya, Al Hamra (near Al Khobar) and Al Khuzama (near Al Khobar). To start, call us or message us on WhatsApp.

Can bitumen rolls be laid directly over an old waterproof layer?

It depends on the condition of the old layer. If it is intact and well bonded, the new rolls may go over it after cleaning and repair. If it is blistered, peeling or lifted in places, it is better removed first. Send photos of the roof so we can see the condition.

Why is the bitumen turned up at the parapet?

Water does not only get in from the middle of the roof. It gets in where the membrane meets the parapet. Turning the roll up at the wall closes that joint and stops water from entering at the edge and travelling under the membrane.

What is the difference between bitumen rolls and a liquid waterproof coating on a roof?

Bitumen rolls are a solid continuous layer bonded by heat or adhesive, thick and resistant to tearing. A liquid coating is poured or brushed on and sets in place. The choice depends on the roof surface, how level it is and how the water drains. Photos help us decide which fits your roof.

Nearby areas

Areas near Al Jisr

If the site is outside Al Jisr, the same service is available in Ishbiliya, Al Hamra (near Al Khobar) and Al Khuzama (near Al Khobar).

Other services in the area

More services in Al Jisr

Empty garden pool during waterproofing work

Tell us about your site in Al Jisr
and we will plan the next step with you

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp