
Bitumen roof waterproofing in Al Faisaliyah (near Ar Rafiah)
We waterproof roofs with bitumen in Al Faisaliyah, beginning with a photo of the roof sent by call or WhatsApp. The district includes residential buildings and houses with flat roofs, and the need for waterproofing varies from roof to roof.
Al Faisaliyah is a mix of mid-sized residential buildings and standalone houses, with many flat concrete roofs that take heat all day. Roofs left unprotected for years often show cracks at the edges and around openings. The photos determine how much treatment is needed, since not every roof needs the same work.
- Al Faisaliyah is a residential district in the Eastern Province, next to Al Andalus, Eshbilya and Ghirnatah, with many mid-sized buildings.
- Roofs under direct sun expand and contract daily, which gradually opens the joints.
What the service covers in Al Faisaliyah (near Ar Rafiah)
- Turning the layer up at the parapet and sealing all edges
- Laying bitumen rolls in overlapping strips and bonding them
- Inspecting the roof and locating cracks and leak points
- Cleaning the surface and treating hairline cracks and joints
The stages of the work in Al Faisaliyah (near Ar Rafiah)
Send photos of the roof
On WhatsApp: photos of the roof surface, the parapet, the AC bases, the tank stand and the drain outlets, so we can read the condition and decide the right treatment.
Clean the surface and treat cracks
The surface is cleaned of dust and debris, and hairline cracks, joints and wider cracks are treated before any roll goes down, because a membrane cannot seal over a crumbling surface.
Lay the bitumen rolls
The rolls are laid in overlapping strips and bonded by heat or adhesive depending on the type, then turned up at the parapet and closed tightly around AC bases, the tank stand and drain openings to form one continuous layer.
Protect the membrane on top
A protective layer is added over the rolls depending on the surface and how it is used, to shield the bitumen from direct sun and from wear, and to extend the life of the membrane.
Why Abraj Al Azl?
One continuous layer, no gapsOverlapping rolls and sealed edges stop water from finding a path under the membrane at any join.
We serve Al Faisaliyah (near Ar Rafiah) and around itIncluding Al Andalus (near Ar Rafiah), Eshbilya and Ghirnatah (near Ar Rafiah), as part of our work across the Eastern Province.
Start from Al Faisaliyah (near Ar Rafiah) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
Questions about bitumen roof waterproofing in Al Faisaliyah (near Ar Rafiah)
Do mid-sized buildings in Al Faisaliyah need a full roof waterproofing?
Not necessarily. Many cases need only targeted repair of weak spots, while full coverage is for widespread leaking. The photos make the difference clear before any decision.
How is leaking around pipe entries handled in Al Faisaliyah?
The spot is cleaned, the joint sealed with a flexible material, and the main layer applied over it. The method depends on the size of the opening and its surroundings, and it becomes clear once the photos are reviewed.
Does the dark surface of bitumen make the rooms below hotter?
Yes, a dark surface absorbs more heat than a white reflective coating. If the main goal is cutting the heat in the rooms below, there are dedicated heat-insulation treatments. If the goal is stopping the leak, bitumen does that job, and a reflective layer can sometimes be added over it depending on the surface.
Can bitumen rolls be laid directly over an old waterproof layer?
It depends on the condition of the old layer. If it is intact and well bonded, the new rolls may go over it after cleaning and repair. If it is blistered, peeling or lifted in places, it is better removed first. Send photos of the roof so we can see the condition.
What should I expect once the work is done?
The roof will be covered with a continuous bitumen membrane, turned up at the edges and around all projecting elements, with a protective layer on top. The membrane must be left to cure fully before the roof is used again, and we tell you when it is ready when the work is agreed.
Do you cover Al Faisaliyah (near Ar Rafiah)?
Yes. We serve Al Faisaliyah (near Ar Rafiah) and nearby areas such as Al Andalus (near Ar Rafiah), Eshbilya and Ghirnatah (near Ar Rafiah), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.
The same service in nearby areas
We also work near Al Faisaliyah (near Ar Rafiah), in Al Andalus (near Ar Rafiah), Eshbilya and Ghirnatah (near Ar Rafiah).
More services in Al Faisaliyah (near Ar Rafiah)
