
Bitumen roof waterproofing in Al Badr
Bitumen roof waterproofing in Al Badr begins with a photo message on WhatsApp or a call. The district has villas and residential buildings with flat roofs exposed to the weather, and bitumen protects concrete from moisture and leaks.
Al Badr features a mix of villas and residential buildings with exposed flat roofs. An older roof may show long cracks or pooled water in dips, while a newer one may only need the bitumen layer refreshed. The area's relative dryness does not prevent heat from affecting the material and degrading it over time. Photos tell the roof's story and help us choose the right solution for your case.
- Al Badr is a district in the Eastern Province, near Al Bustan One, Inak and Qurtubah.
- Flat roofs in residential areas collect water and face intense sun, requiring a lining that prevents leaks and tolerates heat.
What we do for you in Al Badr
- Inspecting the roof and locating cracks and leak points
- Cleaning the surface and treating hairline cracks and joints
- Laying bitumen rolls in overlapping strips and bonding them
- Turning the layer up at the parapet and sealing all edges
The stages of the work in Al Badr
Send photos of the roof
On WhatsApp: photos of the roof surface, the parapet, the AC bases, the tank stand and the drain outlets, so we can read the condition and decide the right treatment.
Clean the surface and treat cracks
The surface is cleaned of dust and debris, and hairline cracks, joints and wider cracks are treated before any roll goes down, because a membrane cannot seal over a crumbling surface.
Lay the bitumen rolls
The rolls are laid in overlapping strips and bonded by heat or adhesive depending on the type, then turned up at the parapet and closed tightly around AC bases, the tank stand and drain openings to form one continuous layer.
Protect the membrane on top
A protective layer is added over the rolls depending on the surface and how it is used, to shield the bitumen from direct sun and from wear, and to extend the life of the membrane.
Why Abraj Al Azl?
One continuous layer, no gapsOverlapping rolls and sealed edges stop water from finding a path under the membrane at any join.
Your request from Al Badr comes to usCall or WhatsApp on one number, and we answer you ourselves.
We serve Al Badr and around itIncluding Al Bustan One, Inak and Qurtubah (near Inak), as part of our work across the Eastern Province.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
Before you book bitumen roof waterproofing in Al Badr
What happens when water pools on an Al Badr roof after rain?
Pooling water on a flat roof can cause leaks if the bitumen membrane is weak or old. Photos show whether there is adequate slope and whether the current waterproofing needs repair or replacement.
Is bitumen alone enough to waterproof an old Al Badr roof?
If the concrete is sound, yes. If there are deep cracks or current leaks, we may need prior repairs. Send clear photos and we will advise what suits your roof.
What is the difference between bitumen rolls and a liquid waterproof coating on a roof?
Bitumen rolls are a solid continuous layer bonded by heat or adhesive, thick and resistant to tearing. A liquid coating is poured or brushed on and sets in place. The choice depends on the roof surface, how level it is and how the water drains. Photos help us decide which fits your roof.
Why is the bitumen turned up at the parapet?
Water does not only get in from the middle of the roof. It gets in where the membrane meets the parapet. Turning the roll up at the wall closes that joint and stops water from entering at the edge and travelling under the membrane.
What decides the cost of bitumen roof waterproofing?
The size of the roof and its condition, the number of cracks and joints that need treatment, the number of details to seal such as AC bases, the tank stand and drain outlets, and whether an old layer needs removing. Send photos and rough dimensions on WhatsApp and we will work out the treatment.
Do you offer bitumen roof waterproofing in Al Badr?
Yes. Al Badr is within our service area in the Eastern Province, and we also work in Al Bustan One, Inak and Qurtubah (near Inak). Call us or send photos of the spot on WhatsApp.
We also offer it in neighbouring areas
We also work near Al Badr, in Al Bustan One, Inak and Qurtubah (near Inak).
More services in Al Badr
