
Bitumen roof waterproofing in Ad Dirah Two
We waterproof flat roofs in Ad Dirah Two with bitumen, starting from photos of the roof sent to us by call or WhatsApp. The district has long-established homes, and their flat roofs need a continuous membrane that protects against rain and damp.
Homes in Ad Dirah are largely long-established houses, some with flat roofs on several levels. Leaks in these older roofs collect at corners and at the joins between different sections, and damp can remain in low spots. The work therefore starts by identifying those points from the photos before choosing how to cover the roof.
- Ad Dirah Two is a residential district in Riyadh, lying close to An Naqa and An Noor.
- Multi-level roofs are made of sections that each need their own drainage path.
The bitumen roof waterproofing work in Ad Dirah Two
- Closing the layer around AC bases, the tank stand and drain openings
- Adding the protective layer over the bitumen once it has cured
- Inspecting the roof and locating cracks and leak points
- Cleaning the surface and treating hairline cracks and joints
The stages of the work in Ad Dirah Two
Send photos of the roof
On WhatsApp: photos of the roof surface, the parapet, the AC bases, the tank stand and the drain outlets, so we can read the condition and decide the right treatment.
Clean the surface and treat cracks
The surface is cleaned of dust and debris, and hairline cracks, joints and wider cracks are treated before any roll goes down, because a membrane cannot seal over a crumbling surface.
Lay the bitumen rolls
The rolls are laid in overlapping strips and bonded by heat or adhesive depending on the type, then turned up at the parapet and closed tightly around AC bases, the tank stand and drain openings to form one continuous layer.
Protect the membrane on top
A protective layer is added over the rolls depending on the surface and how it is used, to shield the bitumen from direct sun and from wear, and to extend the life of the membrane.
Why Abraj Al Azl?
Protection for the reinforcementWater that reaches the reinforcement causes rust and weakens the slab. Sealing the roof early stops that path.
Start from Ad Dirah Two with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
Bitumen roof waterproofing in Ad Dirah TwoWe choose the method and the materials once we know the condition of the spot.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
Real Google reviews, shown exactly as their authors wrote them.
Common questions on bitumen roof waterproofing in Ad Dirah Two
Do multi-level roofs in Ad Dirah Two suit bitumen waterproofing?
Yes, provided each level is flat and has a clear drainage path. Send photos of every level and the joins between them so the right method for each part becomes clear.
What do the photos reveal about an old roof in Ad Dirah Two?
The photos reveal cracks, lifted edges and spots where water has collected. From them we decide whether covering is enough or deeper treatment is needed before the membrane.
What should I send you from Ad Dirah Two?
Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Ad Dirah Two, and we will work out the next step with you.
What should I expect once the work is done?
The roof will be covered with a continuous bitumen membrane, turned up at the edges and around all projecting elements, with a protective layer on top. The membrane must be left to cure fully before the roof is used again, and we tell you when it is ready when the work is agreed.
Can bitumen rolls be laid directly over an old waterproof layer?
It depends on the condition of the old layer. If it is intact and well bonded, the new rolls may go over it after cleaning and repair. If it is blistered, peeling or lifted in places, it is better removed first. Send photos of the roof so we can see the condition.
Why is the bitumen turned up at the parapet?
Water does not only get in from the middle of the roof. It gets in where the membrane meets the parapet. Turning the roll up at the wall closes that joint and stops water from entering at the edge and travelling under the membrane.
We also offer it in neighbouring areas
If the site is outside Ad Dirah Two, the same service is available in An Naqa, An Noor (near Sayhat) and As Salam (near Sayhat).
More services in Ad Dirah Two
