Abraj Al AzlContracting
Call العربية
Empty seaside pool during waterproofing

Pool waterproofing in Umm Ghawr

Water stays in the pool

Waterproofing for concrete pool shells from the inside, before and after tiling

+966 54 311 2066
The service in your area

Pool waterproofing in Umm Ghawr

Pool waterproofing in Umm Ghawr starts with a photo of the inside of the basin, sent by call or WhatsApp. The village has houses and villas with wide yards, and its pools are usually private and close to the homes.

Private pools in villages are sometimes built in stages, so construction joints show between concrete pours and need special treatment before lining. Humid air in the Eastern Province can keep surfaces wet during application, so enough drying time is needed. The photos show the condition of the concrete and the number of joints, so we can see whether one coat is enough.

  • Umm Ghawr is a village in the Al-Ahsa governorate of the Eastern Province, near Ar Rabiyah, Al Kawthar and Ar Rayaan.
  • Construction joints between concrete pours are the first place water escapes in pools built in stages.
What the service includes

The pool waterproofing work in Umm Ghawr

  • Closing the waterproofing around the skimmer, drains and light fittings
  • Applying the layer that suits the condition of the surface
  • Treating cracks, joints and fitting openings
  • Working before or after tiling depending on the condition of the pool
How we work

This is how we work in Umm Ghawr

1

Send photos of the pool

On WhatsApp: photos of the walls, the floor, the corners, the light fittings, the drains and any visible cracks or stains, so we can understand what is happening inside the shell and decide which treatment fits.

2

Inspect the shell and locate the points

The walls, the floor, the corners, all the joints and every opening in the shell are inspected, and the cracks and porous areas and the condition of the render are mapped before the treatment is chosen.

3

Prepare the surface and treat the cracks

The surface is cleaned and prepared, the cracks and joints are treated and the openings around the fittings, the skimmer and the drains are closed before the main layer goes on.

4

Apply the layer and let it cure

The chosen waterproof layer is applied according to the surface type and its condition, then left to cure fully before the pool is refilled or the tiles are bedded on top.

What sets us apart

Why Abraj Al Azl?

Protection for the concrete shellWater that seeps through the shell eventually reaches the reinforcement and weakens it. Closing the shell from the inside cuts off that path.

Your request from Umm Ghawr comes to usCall or WhatsApp on one number, and we answer you ourselves.

Pool waterproofing in Umm GhawrWe choose the method and the materials once we know the condition of the spot.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty garden pool during waterproofing work
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Two workers in high-visibility vests insulating a roof beside the AC units
Round water tank lined in blue inside, with a float in the middle

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on pool waterproofing in Umm Ghawr

Are pour joints in Umm Ghawr pools treated before lining?

Yes, the joints are inspected and sealed with a suitable material before the membrane goes on. If they are wide or moving, the photos will reveal it and show the next step.

Does humidity affect pool lining in Umm Ghawr?

Humidity slows surface drying and can affect adhesion, so the work is scheduled for suitable conditions and dry surfaces. We confirm this after reviewing the photos and the site conditions.

What decides the cost of waterproofing a pool?

The area of the shell and the size of the pool, the condition of the concrete and how many cracks there are, whether the work is before or after tiling, the material that suits the case, and how easily the site can be reached. Send photos of the pool and rough dimensions on WhatsApp and we will suggest the right treatment.

Is Umm Ghawr within your service area?

Yes, Umm Ghawr is one of the areas we work in, as are Ar Rabiyah (near Umm Ghawr), Al Kawthar (near Ar Rafiah) and Ar Rayaan (near Al Adhiriyah). To start, call us or message us on WhatsApp.

Which points in a pool shell leak most often?

The corners between the walls and the floor, the tile joints, the openings around the light fittings, the return fittings and the drains, and the skimmer connection. These points move more than the middle of the wall and open up under the water pressure and the changes in temperature.

Does the pool have to be emptied before the work starts?

In most cases yes, because the waterproofing needs a dry clean surface that can be inspected and prepared. Some crack injection materials work under water, but the final decision depends on the case and where the leak is. Send photos and we will tell you what needs to be prepared before the work starts.

Nearby areas

Areas near Umm Ghawr

If the site is outside Umm Ghawr, the same service is available in Ar Rabiyah (near Umm Ghawr), Al Kawthar (near Ar Rafiah) and Ar Rayaan (near Al Adhiriyah).

Other services in the area

More services in Umm Ghawr

Worker applying the white insulation layer on a villa roof by the sea

Tell us about your site in Umm Ghawr
and we will plan the next step with you

Call us or send photos of the pool and the points you suspect on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp