
Pool waterproofing in Shaybah
We waterproof pool shells in Shaybah from the inside, whether before the tiling goes on or after it. Start by sending photos of the pool by call or WhatsApp so we can establish the condition before choosing a method.
Shaybah is a small village where homes are mostly villas and houses with wide gardens, so the pool often forms part of the back yard. Older concrete shells tend to leak at the joints and around filters and inlets, while a newer one may only need an internal lining. The photos show whether the fault lies in the structure or only in the waterproofing layer.
- Shaybah is a small village in the Eastern Province, lying close to Al Batha, As Sikak and Salwa.
- A pool exposed in an open yard faces intense summer sun, so its waterproofing must tolerate expansion and contraction.
What the service covers in Shaybah
- Leaving the layer to cure before refilling or tiling
- Applying the layer that suits the condition of the surface
- Checking the shell walls, floor and corners
- Treating cracks, joints and fitting openings
From first contact to the finished job in Shaybah
Send photos of the pool
On WhatsApp: photos of the walls, the floor, the corners, the light fittings, the drains and any visible cracks or stains, so we can understand what is happening inside the shell and decide which treatment fits.
Inspect the shell and locate the points
The walls, the floor, the corners, all the joints and every opening in the shell are inspected, and the cracks and porous areas and the condition of the render are mapped before the treatment is chosen.
Prepare the surface and treat the cracks
The surface is cleaned and prepared, the cracks and joints are treated and the openings around the fittings, the skimmer and the drains are closed before the main layer goes on.
Apply the layer and let it cure
The chosen waterproof layer is applied according to the surface type and its condition, then left to cure fully before the pool is refilled or the tiles are bedded on top.
Why Abraj Al Azl?
Water finds no way through the shellA continuous layer closes the cracks, the openings and the joints together, so the water has no path through the shell after treatment.
We serve Shaybah and around itIncluding Al Batha, As Sikak and Salwa, as part of our work across the Eastern Province.
Start from Shaybah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
أفضل شركة عزل اسطح الفوم وخزانات المياه
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in Shaybah
Can an old pool in Shaybah be waterproofed before new tiles go on?
In most cases yes, provided the concrete is sound. Cracks and joints are treated first and then the waterproofing layer goes on; if the shell is damaged, the photos will show it.
Do you waterproof pools at villas inside Shaybah?
Yes, we serve Shaybah. Send photos of the pool, the filter position and the inlets, and we will plan access to the leaking section with you.
Is Shaybah within your service area?
Yes, Shaybah is one of the areas we work in, as are Al Batha, As Sikak and Salwa. To start, call us or message us on WhatsApp.
What decides the cost of waterproofing a pool?
The area of the shell and the size of the pool, the condition of the concrete and how many cracks there are, whether the work is before or after tiling, the material that suits the case, and how easily the site can be reached. Send photos of the pool and rough dimensions on WhatsApp and we will suggest the right treatment.
Which points in a pool shell leak most often?
The corners between the walls and the floor, the tile joints, the openings around the light fittings, the return fittings and the drains, and the skimmer connection. These points move more than the middle of the wall and open up under the water pressure and the changes in temperature.
Does the pool have to be emptied before the work starts?
In most cases yes, because the waterproofing needs a dry clean surface that can be inspected and prepared. Some crack injection materials work under water, but the final decision depends on the case and where the leak is. Send photos and we will tell you what needs to be prepared before the work starts.
More services in Shaybah


