Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Yakrub

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Yakrub

Pool waterproofing before tiling in Yakrub starts with photos of the floor, walls and corners sent by call or WhatsApp. The small village has villas with private pools that need careful concrete preparation, crack and joint treatment before tiles are laid.

Yakrub is a small village with rural villas and private pools of various sizes. Before tiling, the concrete floor and walls must be carefully prepared, with fine cracks, joints and pipe entries sealed. The dry rural climate affects drying speed, but the pool itself faces heat shifts and water pressure. Photos identify sections needing extra treatment before tiles and adhesive are applied.

  • Yakrub is a small village in the Eastern Province, near Al Kidadiyah, Fudah and Qusayba'.
  • Pools in small villages are often built with varying concrete quality, so careful inspection before tiling ensures reliable waterproofing.
What the service includes

The main items of pool waterproofing before tiling in Yakrub

  • Treating corners and pour joints with a suitable compound
  • Cleaning the surface and removing casting residue and dust
  • Checking the layer is complete before tiling is allowed to begin
  • Applying the waterproof layer across the floor, walls and pool rim
How we work

How we carry out pool waterproofing before tiling in Yakrub

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.

Pool waterproofing before tiling in YakrubWe choose the method and the materials once we know the condition of the spot.

We serve Yakrub and around itIncluding Al Kidadiyah (near Ayn Dar), Fudah and Qusayba', as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on pool waterproofing before tiling in Yakrub

Can an old pool in Yakrub be waterproofed without removing old tiles?

No, old tiles must be removed first so we can inspect the concrete and seal cracks and joints. Then waterproofing goes on, followed by new tiles.

Does pool waterproofing before tiling protect against future leaks in Yakrub?

Yes, correct treatment before tiling stops water entering the concrete. But tiles and their joints also need regular care to ensure ongoing protection.

How do I request pool waterproofing before tiling in Yakrub?

Call us, or send clear photos of the spot and its location in Yakrub on WhatsApp, and we will work out the next step with you.

What decides the cost of waterproofing a pool before tiling?

The area of the inner shell and the pool depth, the number of cracks and the condition of the joints, the type and number of inlets and fittings, and how easy the site is to reach. Send photos and rough dimensions on WhatsApp and we will work out the right treatment.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

Why is the pool shell waterproofed before tiling and not after?

Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.

Nearby areas

Pool waterproofing before tiling near Yakrub

We also offer pool waterproofing before tiling in Al Kidadiyah (near Ayn Dar), Fudah and Qusayba', among the closest areas to Yakrub.

Other services in the area

More services in Yakrub

Mosaic-tiled seaside pool

Your first step in Yakrub:
a call or a WhatsApp message

Describe the problem and where it is in Yakrub, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp