Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Umm al Hawshat

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Umm al Hawshat

We provide pool waterproofing before tiling in Umm al Hawshat, starting with photos of the pool shell and its pipe inlets sent by call or WhatsApp. The area lies close to Al Yasmin, the government departments and An Nuzhah in the Eastern Province.

The area is made up of homes and residential buildings, both newer and older, with pools usually sitting in the back yards of villas. An older concrete shell often shows wear at the joints and around its openings. The photos determine whether the job is limited to local repair or covers the whole shell before the tiles go in.

  • Umm al Hawshat is a village in the Al-Ahsa governorate of the Eastern Province, near Al Yasmin and An Nuzhah.
  • Drain openings and metal fittings are among the points where water collects most.
What the service includes

What we do for you in Umm al Hawshat

  • Inspecting the concrete and locating cracks and hairline cracks
  • Cleaning the surface and removing casting residue and dust
  • Checking the layer is complete before tiling is allowed to begin
  • Applying the waterproof layer across the floor, walls and pool rim
How we work

From first contact to the finished job in Umm al Hawshat

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.

Pool waterproofing before tiling in Umm al HawshatWe choose the method and the materials once we know the condition of the spot.

Start from Umm al Hawshat with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book pool waterproofing before tiling in Umm al Hawshat

What comes before the tiles when waterproofing a pool in Umm al Hawshat?

The concrete surface is cleaned, any cracks are repaired, then the waterproofing layer goes on and is left to dry before the tile adhesive. That order protects the tiling from lifting later.

Do you treat pipe inlets in pools in Umm al Hawshat?

Yes, pipe inlets are sensitive points and we treat them as part of the work. Send a photo of each inlet with its position in the pool so we can agree how to treat it.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

Do you cover Umm al Hawshat?

Yes. We serve Umm al Hawshat and nearby areas such as Al Yasmin (near Umm al Hawshat), Government Departments (near Umm al Hawshat) and An Nuzhah (near Umm al Hawshat), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Which tight spots on the pool shell need the most attention?

The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.

Why is the pool shell waterproofed before tiling and not after?

Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.

Nearby areas

Areas near Umm al Hawshat

We also work near Umm al Hawshat, in Al Yasmin (near Umm al Hawshat), Government Departments (near Umm al Hawshat) and An Nuzhah (near Umm al Hawshat).

Other services in the area

More services in Umm al Hawshat

Mosaic-tiled seaside pool

We start with you in Umm al Hawshat
with one call

Call us or send photos of the shell, corners and pipe inlets on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp