Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Suq Al Mashiya

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Suq Al Mashiya

Pool waterproofing before tiling in Suq Al Mashiya begins with photos of the pool and cracks sent by call or WhatsApp. The district has diverse villas and apartment buildings, and its pools are in varying conditions.

Suq Al Mashiya mixes older and newer buildings, with pools varying greatly in age and condition. An older pool usually needs comprehensive treatment because concrete has endured constant pressure, sun and moisture for years. Cracks appear around corners and horizontal and vertical joints, and leaks from drain openings are very common. Newer pools may need only localised repairs before tiling. Photos clearly determine the scope of work required.

  • Suq Al Mashiya is a district in the Eastern Province, close to Ashuhada, Ar Rabie and Al Muruj, with villas and residential apartment buildings.
  • Drain openings and overflow points are the most leak-prone areas in older pools before retiling.
What the service includes

What we do for you in Suq Al Mashiya

  • Cleaning the surface and removing casting residue and dust
  • Closing feed and drain pipe inlets and light fitting openings
  • Treating corners and pour joints with a suitable compound
  • Checking the layer is complete before tiling is allowed to begin
How we work

The stages of the work in Suq Al Mashiya

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.

We serve Suq Al Mashiya and around itIncluding Ashuhada, Ar Rabie (near Nuayriyah) and Al Muruj (near Nuayriyah), as part of our work across the Eastern Province.

Suq Al Mashiya is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Suq Al Mashiya

Does leaking from the drain opening mean replacing the entire pool's pipes?

Not necessarily. Usually the problem is at the joint between the pool and the pipe, which we treat directly before tiling. Photos show exactly where the leak is coming from.

Do we need to replace the concrete in an old pool in Suq Al Mashiya?

Not always. If the concrete structure is sound we treat only the cracks and joints. If the structure is damaged, the photos will show it and we will tell you beforehand.

Do you offer pool waterproofing before tiling in Suq Al Mashiya?

Yes. Suq Al Mashiya is within our service area in the Eastern Province, and we also work in Ashuhada, Ar Rabie (near Nuayriyah) and Al Muruj (near Nuayriyah). Call us or send photos of the spot on WhatsApp.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

Why is the pool shell waterproofed before tiling and not after?

Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.

Which tight spots on the pool shell need the most attention?

The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.

Nearby areas

The same service in nearby areas

We also offer pool waterproofing before tiling in Ashuhada, Ar Rabie (near Nuayriyah) and Al Muruj (near Nuayriyah), among the closest areas to Suq Al Mashiya.

Other services in the area

More services in Suq Al Mashiya

Mosaic-tiled seaside pool

We start with you in Suq Al Mashiya
with one call

Call us or send photos of the shell, corners and pipe inlets on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp