Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Sayhat

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Sayhat

Pool waterproofing before tiling in Sayhat begins with photos sent by WhatsApp or call showing the concrete, cracks and joints. The town has varied villas and residential buildings with private pools, each needing separate inspection and assessment before moving to the tiling stage.

Pools in Sayhat vary in size, age and location. Concrete exposed to sun and air faces constant stress from heat and coastal humidity. Joints between pool components are often weak and are the first place water leaks from. Small cracks may only appear after the pool is filled with water. Treating the concrete, joints and cracks before tiling is necessary to prevent leaks throughout the pool's use.

  • Sayhat is a town in the Eastern Province near As Salam, Al Ferdous and Az Zuhur.
  • Pool leaks usually start at joints and corners, especially when concrete is exposed to both water and heat.
What the service includes

What we do for you in Sayhat

  • Applying the waterproof layer across the floor, walls and pool rim
  • Inspecting the concrete and locating cracks and hairline cracks
  • Treating corners and pour joints with a suitable compound
  • Checking the layer is complete before tiling is allowed to begin
How we work

The stages of the work in Sayhat

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.

Pool waterproofing before tiling in SayhatWe choose the method and the materials once we know the condition of the spot.

Sayhat is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book pool waterproofing before tiling in Sayhat

When does a leak appear in a Sayhat pool after tiling?

It may appear in days or weeks if the concrete and joints were not well treated. Careful treatment before tiling prevents leaks. Send pool photos so we can inspect cracks and joints before starting.

Do you treat damp in pool concrete before sealing and tiling?

Yes, damp prevents good adhesion of sealant and tiles. We dry and clean the concrete and may need localised treatment before sealing. Photos show us the damp condition and areas needing attention.

What should I send you from Sayhat?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Sayhat, and we will work out the next step with you.

Why is the pool shell waterproofed before tiling and not after?

Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

Which tight spots on the pool shell need the most attention?

The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.

Nearby areas

The same service in nearby areas

We also work near Sayhat, in As Salam (near Sayhat), Al Ferdous (near Sayhat) and Az Zuhur (near Sayhat).

Other services in the area

More services in Sayhat

Mosaic-tiled seaside pool

Pool waterproofing before tiling in Sayhat?
Call us now

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp