
Pool waterproofing before tiling in Sanabis (near An Narjis One)
Pool waterproofing before tiling in Sanabis begins by sending shell photos via WhatsApp or by calling to assess condition. Sanabis has residential villas and gardens, many with private pools needing careful preparation before tiling. Proper sealing ensures water does not seep behind the tile later.
Villas in Sanabis are closely built, often with green spaces and small yards containing private pools. The concrete shell faces both intense heat and humidity, especially as the area is near the coast. This causes small cracks at corners, joints and around pipe entries. If cracks are not treated before tiling, water will seep behind the tile and penetrate other layers. Cleaning the concrete, filling cracks and joints, and applying sealant must all be done before any tile work. Photos help identify areas needing extra treatment.
- Sanabis is a district in the Eastern Province near Al Jawharah, An Narjis One and As Sawari, with residential villas and private pools.
- Pools in closely adjoining villas are exposed to increased humidity from poor ventilation.
The main items of pool waterproofing before tiling in Sanabis (near An Narjis One)
- Treating corners and pour joints with a suitable compound
- Closing feed and drain pipe inlets and light fitting openings
- Inspecting the concrete and locating cracks and hairline cracks
- Cleaning the surface and removing casting residue and dust
From first contact to the finished job in Sanabis (near An Narjis One)
Send photos of the pool
On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.
Prepare the surface
The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.
Apply the waterproof layer
Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.
Cure before tiling begins
The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.
Why Abraj Al Azl?
No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.
Start from Sanabis (near An Narjis One) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
Sanabis (near An Narjis One) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
Before you book pool waterproofing before tiling in Sanabis (near An Narjis One)
Do small cracks in the pool floor need sealing before tiling?
Yes, even very fine cracks allow water through if not treated. Water finds its way through the tiniest gaps. Treating all cracks and joints before tiling stops seepage from the start. Photos show which cracks need attention.
Can a pool be sealed during the hot summer in Sanabis?
Treating the pool depends on the material used and the temperature. Some materials need specific heat levels to cure properly. Send photos and call us to discuss the right timing and materials for your conditions.
What materials are used to waterproof a pool shell before tiling?
Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.
How long must the waterproof layer cure before tiles go on?
It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.
Which tight spots on the pool shell need the most attention?
The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.
Do you cover Sanabis (near An Narjis One)?
Yes. We serve Sanabis (near An Narjis One) and nearby areas such as Al Jawharah (near Tarout), Sanabis (near Tarout) and An Narjis One, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.
We also offer it in neighbouring areas
If the site is outside Sanabis (near An Narjis One), the same service is available in Al Jawharah (near Tarout), Sanabis (near Tarout) and An Narjis One.
More services in Sanabis (near An Narjis One)


